TEXAS · WELLS · HIDALGO COUNTY · API 42-215-30932 · DISTRICT 04

Woods Christian #20

Y

Hidalgo County · McAllen Ranch (Vksbg P-V S Cons) field · Producing  · Sidetrack

Woods Christian #20 (API 42-215-30932) is a well in Hidalgo County operated by Merit Energy Company, completed August 3, 2000 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1979 and 2000, permitted to 12,517 ft.

It was permitted by Shell Western E&P and has since transferred to Merit Energy Company on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Merit Energy Company

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShell Western E&P
Production reportsMerit Energy Companythrough Apr 2026
Latest permitShell Western E&PMay 17, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,517
total depth, ft
2
permits on file
May 17, 2000
last permit issued
Aug 3, 2000
completed
0
cumulative oil, bbl
1.73M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 3, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Woods Christian G-4-178826McAllen Ranch (Vksbg P-V,s Cons)Merit Energy Company10669KAug 2000 – Jul 2026
Christian, Woods G-4-85735McAllen Ranch (Vicksburg S)Shell Western E&P101.06MJan 1993 – Aug 2000

Gas, mcf lease total

Last 12 months 3,565 · prior 12 4,299(-17%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1993 → Jan 2000
  2. 2Shell Western E&PAug 2000 → Jun 2009
  3. 3Merit Energy CompanySep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495177-99Recompletion · sidetrackShell Western E&PMay 17, 2000May 17, 2000Jan 11, 200012,100
51030-99DrillShell Oil CompanyJun 18, 1979Jun 18, 1979Jul 17, 197912,251

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 3, 2000Woods Christian G-4-178826McAllen Ranch (Vksbg P-V S Cons)Merit Energy CompanyProducing12,517
Nov 6, 1979Christian Woods G-4-85735McAllen Ranch (Vicksburg S)Shell Western E&PNot on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
10,96010,988Perforated
11,93712,038Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,77017.5900 S
9.6258,30712.251,665 S
2.87510,9954.125100 S
2.87511,870——
512,3298.752,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 11, 2000Aug 24, 2000—
00Oct 11, 2000——
00Jan 12, 1984Jan 11, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21530932, documented in the API reference.