WELL · 42-215-30987 · DISTRICT 4

Martinez E.L. Gas Unit I #1

N

Hidalgo County · Guadalupe (Cavazos) field  · Vertical

Martinez E.L. Gas Unit I #1 (API 42-215-30987) is a permitted well in Hidalgo County filed by Hilcorp Energy Company; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1979 and 2017, permitted to 11,600 ft.

Completion filings report 4 formation tops, including Catahoula, Miocene (undifferentiated), Vicksburg, Jackson.

Its 3 leases have reported 17.2K barrels of oil and 431K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Dec 2020
Latest permitHilcorp Energy CompanyMar 30, 2017
11,600
total depth, ft
2
permits on file
Mar 30, 2017
last permit issued
—
completed
17.2K
cumulative oil, bbl
431K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Martinez, E.L. Gas Unit 1 G-4-289631San Ramon (8300)Hilcorp Energy Company10198KApr 2017 – Jul 2026
Martinez, E.L. Gas Unit I O-4-12839Guadalupe (Cavazos)Hilcorp Energy Company117.2K66.3KMar 1999 – Aug 2020
Martinez, E. L. Gas Unit 1 G-4-87753Guadalupe (Cavazos)Energy Development Corp.10166KJan 1993 – Mar 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energy Development Corp.Jan 1993 → Dec 2001
  2. 2Samedan Oil CorporationJan 2002 → Dec 2002
  3. 3Noble Energy IncJan 2003 → Feb 2004
  4. 4Hilcorp Energy CompanyOct 2013 → Dec 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
824723-99RecompletionHilcorp Energy CompanyMar 22, 2017Mar 30, 2017Apr 19, 201711,155
67241-99DrillInexco Oil CompanyDec 19, 1979Dec 19, 1979Jan 2, 198011,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-87753————
—— G-4-289631————
—— O-4-12839————

Formation tops

As filed on W-2/G-1. Subsea from 208 ft elevation.Download CSV →

FormationMD ftSubsea
CatahoulaCATAHOULA-FRIO740-532
Miocene (undifferentiated)MIOCENE-LAGARTO-OAKVILLE1,600-1,392
CatahoulaCATAHOULA-ANAHUAC2,400-2,192
Vicksburg5,400-5,192
Jackson11,800-11,592

Perforations

Perforated and open-hole intervals.

FromToType
8,2808,318Perforated
10,61210,670Perforated
10,61210,803Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,10017.51,875 S
9.6257,89112.51,800 S
9.6257,98112.51,800 S
7.62510,1458.5625 S
2.87510,525——
2.37510,525——
5.511,1528.5625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 12, 2020Aug 3, 2020—
00Aug 25, 1999Apr 2, 1999—
00Jul 1, 1999——
00Sep 30, 1994May 23, 1994—
00Jan 12, 1984Apr 16, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21530987, documented in the API reference.