TEXAS · WELLS · HIDALGO COUNTY · API 42-215-31095 · DISTRICT 04

Christian Woods #5

Plugged

Hidalgo County · Guadalupe (Vicksburg J-1) field  · Vertical

Christian Woods #5 (API 42-215-31095) is a plugged well in Hidalgo County, plugged December 9, 2009, last operated by Forest Oil Corporation.

The RRC has issued 3 drilling permits (amended once) between 1980 and 1998, permitted to 12,562 ft.

It was permitted by Fina Oil & Chemical Company and has since transferred to Forest Oil Corporation on the wellbore schedule.

Operator of record

Forest Oil Corporation

Permitted by Fina Oil & Chemical Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 6, 2016
Permits on file
1,861
Phone
(832) 242-9600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleForest Oil Corporation
Production reportsShell Western E&Pthrough Jun 2006
Latest permitFina Oil & Chemical CompanyMay 28, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,562
total depth, ft
4
permits on file
May 28, 1998
last permit issued
Mar 1, 1996
completed
0
cumulative oil, bbl
448K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 1, 1996
Shut in
—
Plugged
Dec 9, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Christian, Woods G-4-167528WildcatForest Oil Corporation10343KApr 1996 – Dec 2009
Christian, Woods G-4-94694Guadalupe (Vicksburg, Lo. SiestaFina Oil & Chemical Company10105KJan 1993 – Mar 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyMay 1993 → Dec 2000
  2. 2Totalfinaelf E&P USA IncJan 2001 → Aug 2003
  3. 3Total E&P USA, Inc.Sep 2003 → Jan 2006
  4. 4Shell Western E&PFeb 2006 → Jun 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
476637-98RecompletionFina Oil & Chemical CompanyFeb 24, 1999May 28, 1998Jan 3, 19969,000
476637-99RecompletionFina Oil & Chemical CompanyMay 27, 1998May 28, 1998—9,000
454518-99RecompletionFina Oil & Chemical CompanyOct 30, 1996Nov 1, 1996Jan 3, 19969,000
101493-99DrillTenneco Oil Co.Dec 10, 1980Dec 10, 1980Dec 30, 198012,562

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 1, 1996Christian Woods G-4-167528Guadalupe (Vicksburg J-1)Forest Oil CorporationPlugged—
Mar 1, 1996Christian Woods G-4-167528Guadalupe (Vicksburg J-1)Forest Oil CorporationPlugged—
Jun 13, 1981Christian Woods G-4-94694Guadalupe (Vicksburg Lo. SiestaFina Oil & Chemical CompanyPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,0688,072Perforated
8,1008,104Perforated
12,13712,250Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,78017.5740 S
9.6257,9258.751,080 S
9.6257,92510.751,080 S
2.87511,937——
5.512,5676.5350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 23, 1999May 27, 1998—
00May 20, 1998Jan 14, 1997Yes
00Apr 23, 1998——
00Jan 12, 1984Jun 23, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531095, documented in the API reference.