WELL · 42-215-31100 · DISTRICT 4

West Temple W. #32

Plugged

Hidalgo County · Tabasco (Consolidated) field  · Vertical

West Temple W. #32 (API 42-215-31100) is a plugged well in Hidalgo County, plugged November 6, 2013, last operated by Fidelity Explor. & Prod. CO..

The RRC has issued 2 drilling permits between 1980 and 2001, permitted to 8,500 ft.

It was permitted by Smith Production Inc. and has since transferred to Fidelity Explor. & Prod. CO. on the wellbore schedule.

Operator of record

Fidelity Explor. & Prod. Co.

Permitted by Smith Production Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Inactive (I)
P-5 last filed
Jun 20, 2016
Permits on file
163
Phone
(720) 931-9631

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFidelity Explor. & Prod. Co.
Production reportsFidelity Explor. & Prod. Co.through Jun 2013
Latest permitSmith Production Inc.May 2, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
2
permits on file
May 2, 2001
last permit issued
Apr 3, 2006
completed
0
cumulative oil, bbl
923K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 3, 2006
Shut in
—
Plugged
Nov 6, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West, Temple W. G-4-182473Tabasco (S)Fidelity Explor. & Prod. Co.10374KApr 2001 – Nov 2013
West, Temple W. G-4-93685Tabasco (U)Smith Production Inc.10549KJan 1993 – Jun 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco Oil & Gas Co.Jan 1993 → Feb 1994
  2. 2Vastar Resources, Inc.Mar 1994 → Jan 1999
  3. 3Smith Production Inc.Feb 1999 → Apr 2005
  4. 4Fidelity Explor. & Prod. Co.May 2005 → Jun 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
508387-99RecompletionSmith Production Inc.May 1, 2001May 2, 2001Apr 3, 20018,410
103917-99DrillArco Oil & Gas Co.Dec 31, 1980Dec 31, 1980Feb 20, 19818,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-93685————
—— G-4-182473————

Perforations

Perforated and open-hole intervals.

FromToType
6,6626,666Perforated
6,6956,700Perforated
6,7556,760Perforated
6,8526,888Perforated
6,9006,910Perforated
6,9126,927Perforated
7,4987,502Perforated
7,5127,534Perforated
7,8247,830Perforated
7,8677,878Perforated
7,9067,918Perforated
7,9577,968Perforated
8,0768,096Perforated
8,0768,118Perforated
8,076—Perforated
8,096—Perforated
8,1088,118Perforated
8,108—Perforated
8,118—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,02314.51,000 S
10.752,023—1,000 S
7.6257,4189.8751,100 S
7.6257,418—1,200 S
2.3758,040——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 21, 2007Sep 5, 2006—
00Jul 26, 2001May 2, 2001Yes
00May 31, 2001——
00Jan 9, 1997Nov 18, 1996—
00Nov 5, 1993Sep 30, 1993—
00Jan 12, 1984Jun 11, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531100, documented in the API reference.