WELL · 42-215-31125 · DISTRICT 4

Evertt Bell Gas Unit 1 #6

Plugged

Hidalgo County · Tabasco (Consolidated) field  · Vertical

Evertt Bell Gas Unit 1 #6 (API 42-215-31125) is a plugged well in Hidalgo County, plugged November 1, 2010, last operated by Fidelity Explor. & Prod. CO..

The RRC has issued 4 drilling permits between 1981 and 2003, permitted to 9,000 ft.

It was permitted by Smith Production Inc. and has since transferred to Fidelity Explor. & Prod. CO. on the wellbore schedule.

Operator of record

Fidelity Explor. & Prod. Co.

Permitted by Smith Production Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Inactive (I)
P-5 last filed
Jun 20, 2016
Permits on file
163
Phone
(720) 931-9631

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFidelity Explor. & Prod. Co.
Production reportsSmith Production Inc.through Nov 2004
Latest permitSmith Production Inc.May 30, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
4
permits on file
May 30, 2003
last permit issued
Apr 3, 2003
completed
0
cumulative oil, bbl
388K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 3, 2003
Shut in
—
Plugged
Nov 1, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Evertt Bell Gas Unit 1 G-4-195046Tabasco (S)Fidelity Explor. & Prod. Co.101.9KApr 2003 – Oct 2010
E. Bell GU 1 G-4-188043Tabasco (T)Smith Production Inc.103.1KOct 2001 – Apr 2003
Bell, Everett GU I G-4-174506Tabasco (V)Smith Production Inc.10185KAug 1999 – Nov 2002
Bell, E. Gas Unit I G-4-94601Tabasco (X)Smith Production Inc.10198KJan 1993 – Aug 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco Oil & Gas Co.Jan 1993 → Feb 1994
  2. 2Vastar Resources, Inc.Mar 1994 → Jan 1999
  3. 3Smith Production Inc.Feb 1999 → Nov 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
532436-99RecompletionSmith Production Inc.May 28, 2003May 30, 2003Mar 27, 20038,898
515295-99RecompletionSmith Production Inc.Nov 12, 2001Nov 14, 2001Oct 9, 20018,898
488068-99RecompletionSmith Production Inc.Sep 30, 1999Oct 6, 1999Aug 20, 19998,898
116051-99DrillArco Oil & Gas Co.Apr 16, 1981Apr 16, 1981—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-94601————
—— G-4-174506————
—— G-4-188043————
—— G-4-195046————

Perforations

Perforated and open-hole intervals.

FromToType
7,4907,508Perforated
7,5527,566Perforated
7,7607,770Perforated
7,7767,789Perforated
8,1008,117Perforated
8,5048,560Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,02014.751,130 S
7.6257,4409.8751,450 S
2.3758,450——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 2003May 27, 2003Yes
00Jun 26, 2003——
00Jul 8, 2002Nov 5, 2001Yes
00Apr 16, 2002——
00Nov 12, 1999Sep 30, 1999Yes
00Oct 25, 1999——
00Jan 12, 1984Jul 23, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531125, documented in the API reference.