TEXAS · WELLS · HIDALGO COUNTY · API 42-215-31126 · DISTRICT 04

Coates A #4

Plugged

Hidalgo County · Jeffress E. (Vicksburg S) field  · Vertical

Coates A #4 (API 42-215-31126) is a plugged well in Hidalgo County, plugged February 10, 2009, last operated by El Paso E & P Company L. P..

The RRC has issued 2 drilling permits between 1981 and 2002, permitted to 13,294 ft.

It was permitted by El Paso Production Oil & Gas CO. and has since transferred to El Paso E & P Company L. P. on the wellbore schedule.

Operator of record

El Paso E & P Company L. P.

Permitted by El Paso Production Oil & Gas Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
May 8, 2012
Permits on file
582
Phone
(713) 420-7557

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCantera Operating LLC
Production reportsEl Paso E & P Company, L. P.through Feb 2009
Latest permitEl Paso Production Oil & Gas Co.Jun 21, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,294
total depth, ft
2
permits on file
Jun 21, 2002
last permit issued
Mar 23, 2004
completed
0
cumulative oil, bbl
2.97M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 23, 2004
Shut in
—
Plugged
Feb 10, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Coates "A" G-4-95708Jeffress, E. (Vicksburg T)EP Energy E&P Company, L.P.101.94MJan 1993 – Aug 2012
Coates "A" G-4-190127Jeffress, E. (Vicksburg S)El Paso E & P Company, L. P.101.03MJan 2002 – Jul 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Coastal Oil & Gas CorporationJan 1993 → Jun 2001
  2. 2Greenbrier Oper. Co.Oct 1995 → Dec 1999
  3. 3El Paso Production Oil & Gas Co.Jul 2001 → Feb 2006
  4. 4El Paso E & P Company, L. P.Jun 2007 → Feb 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
521269-99RecompletionEl Paso Production Oil & Gas Co.Jun 21, 2002Jun 21, 2002Jan 17, 200213,294
116176-99DrillBorder Exploration Co.Apr 27, 1981Apr 27, 1981—13,280

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 23, 2004Coates A G-4-190127Jeffress E. (Vicksburg S)El Paso E & P Company L. P.Plugged—
Sep 5, 1981Coates A G-4-95708Jeffress E. (Vicksburg T)Cantera Operating LLCPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
11,13011,336Perforated
11,14811,226Perforated
11,25811,276Perforated
11,25811,336Perforated
12,32112,930Perforated
12,93012,321Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,36617.51,480 S
9.6257,40012.5930 S
2.87512,185——
5.513,2796.75375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 7, 2004Oct 13, 2004—
00Oct 15, 2002Aug 5, 2002—
00Aug 30, 2002——
00Jan 12, 1984Sep 25, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531126, documented in the API reference.