TEXAS · WELLS · HIDALGO COUNTY · MUCHER, J. ET AL LEASE · API 42-215-31186 · DISTRICT 04

Mucher J. et Al #1

Plugged

Hidalgo County · Arrowhead Ranch (VKS 12600 FB-2) field  · Vertical

Mucher J. ET AL #1 (API 42-215-31186) is a plugged well in Hidalgo County, plugged November 29, 2012, last operated by Chesapeake Operating Inc..

The RRC has issued one drilling permit, issued October 20, 1981, permitted to 16,000 ft.

It was permitted by Cng Producing Company and has since transferred to Chesapeake Operating Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Frio, Vicksburg.

Operator of record

Chesapeake Operating Inc.

Permitted by CNG Producing Company; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Delinquent (D)
P-5 last filed
Dec 10, 2024
Permits on file
13,061
Phone
(405) 935-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsChesapeake Operating, Inc.through Jan 2009
Latest permitCNG Producing CompanyOct 20, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

16,000
total depth, ft
1
permits on file
Oct 20, 1981
last permit issued
Mar 12, 2005
completed
0
cumulative oil, bbl
219K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 12, 2005
Shut in
—
Plugged
Nov 29, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mucher, J. et Al G-4-102372Arrowhead Ranch (VKS 12600 FB-2)Chesapeake Operating, Inc.10219KJan 1993 – Nov 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Graham Royalty, Ltd.Jan 1993 → Oct 1993
  2. 2Midpar L.P.Nov 1993 → Feb 1995
  3. 3Parker & Parsley Development L.PMar 1995 → Aug 1997
  4. 4Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 1999
  5. 5Prize Operating CompanyJul 1999 → Mar 2002
  6. 6Gruy Petroleum Management Co.Apr 2002 → Mar 2004
  7. 7Denali Oil & Gas Management, LLCApr 2004 → Jan 2006
  8. 8Chesapeake Operating, Inc.Feb 2006 → Jan 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
137541-99DrillCNG Producing CompanyOct 20, 1981Oct 20, 1981Nov 16, 198116,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 12, 2005Mucher J. et Al G-4-102372Arrowhead Ranch (VKS 12600 FB-2)Chesapeake Operating Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 342 ft elevation.Download CSV →

FormationMD ftSubsea
FrioLOWER FRIO TOP5,340-4,998
VicksburgVICKSBURG TOP(BY CORRELATION)6,990-6,648

Perforations

Perforated and open-hole intervals.

FromToType
12,67012,782Perforated
12,68012,782Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,00017.51,775 S
9.62511,39512.252,565 S
2.37512,601——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 17, 2005Apr 11, 2005—
00Jan 12, 1984Jun 7, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531186, documented in the API reference.