TEXAS · WELLS · HIDALGO COUNTY · API 42-215-31428 · DISTRICT 04

Johnson F.I. #39D

Plugged

Hidalgo County · Monte Christo (42) field  · Vertical

Johnson F.I. #39D (API 42-215-31428) is a plugged well in Hidalgo County, plugged January 11, 2013, last operated by Newfield Exploration Company.

The RRC has issued 5 drilling permits between 1983 and 1989, permitted to 8,900 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Newfield Exploration Company on the wellbore schedule.

Completion filings report 4 formation tops, including 46 Sd., 49 Sd., 50a Sand, 56b Sand.

Operator of record

Newfield Exploration Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 2, 2022
Permits on file
821
Phone
(281) 210-5100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNewfield Exploration Company
Production reportsMobil Producing TX. & N.M. Inc.through Jun 1995
Latest permitMobil Producing TX. & N.M. Inc.Mar 16, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,900
total depth, ft
5
permits on file
Mar 16, 1989
last permit issued
Apr 19, 1989
completed
0
cumulative oil, bbl
23.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 19, 1989
Shut in
—
Plugged
Jan 11, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson, F. I. G-4-110230Monte Christo (46)Newfield Exploration Company1023.6KJan 1993 – Jan 2013
Johnson, F.I. G-4-127828Monte Christo (42)Newfield Exploration Company100Jan 1993 – Jan 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Jun 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
357088-99RecompletionMobil Producing TX. & N.M. Inc.Mar 15, 1989Mar 16, 1989—8,850
340054-99RecompletionMobil Producing TX. & N.M. Inc.Dec 11, 1987Dec 15, 1987—7,900
328325-99RecompletionMobil Producing TX. & N.M. Inc.Mar 27, 1987Apr 1, 1987—8,850
305738-99RecompletionMobil Producing TX. & N.M. Inc.Aug 27, 1986Aug 28, 1986—8,850
225051-99DrillSuperior Oil Company, TheMay 2, 1984Dec 29, 1983Jan 18, 19848,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 19, 1989Johnson F.I. G-4-127828Monte Christo (42)Newfield Exploration CompanyPlugged—
Apr 19, 1989Johnson F.I. G-4-127828Monte Christo (42)Newfield Exploration CompanyPlugged—
May 16, 1987Johnson F.I. G-4-124279Monte Christo (48)Mobil Producing TX. & N.M. Inc.Plugged—
Sep 11, 1986Johnson F.I. G-4-122400Monte Christo (49)Mobil Producing TX. & N.M. Inc.Plugged—
May 8, 1984Johnson F. I. G-4-110861Monte Christo (50-a South)Mobil Producing TX. & N.M. Inc.Plugged—
Apr 11, 1984Johnson F. I. G-4-110230Monte Christo (46)Newfield Exploration CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 212 ft elevation.Download CSV →

FormationMD ftSubsea
46 Sd.7,689-7,477
49 Sd.8,004-7,792
50A Sand8,046-7,834
56B Sand8,669-8,457

Perforations

Perforated and open-hole intervals.

FromToType
7,3417,404Perforated
7,4507,462Perforated
7,6897,698Perforated
7,9357,965Perforated
8,0068,019Perforated
8,0468,105Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,85013.5895 S
9.6251,850——
2.8758,850—2,452 sx
2.8758,8508.752,652 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 16, 1989May 12, 1989Yes
00Sep 6, 1988Jul 21, 1988—
00Aug 15, 1988——
00Jul 24, 1987Jun 9, 1987—
00Jun 18, 1987——
00Nov 13, 1986Oct 22, 1986Yes
00Nov 1, 1986——
00Jun 20, 1984May 24, 1984—
00Jun 15, 1984May 24, 1984—
00May 11, 1984Apr 30, 1984—
00May 9, 1984Apr 30, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531428, documented in the API reference.