TEXAS · WELLS · HIDALGO COUNTY · API 42-215-31454 · DISTRICT 04
Johnson F.I. #45F
Hidalgo County · Monte Christo ( 40) field · Shut In-Multi-Compl · Vertical
Johnson F.I. #45F (API 42-215-31454) is a well in Hidalgo County operated by Hilcorp Energy Company, completed September 30, 1988 and listed as shut in-multi-compl on the RRC schedule, shut in January 1, 1998.
The RRC has issued 5 drilling permits (amended once) between 1984 and 1988, permitted to 7,850 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, 39a, 49.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Mobil Producing TX. & N.M. Inc.through Jan 1996 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Aug 16, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,850
- total depth, ft
- 6
- permits on file
- Aug 16, 1988
- last permit issued
- Sep 30, 1988
- completed
- 0
- cumulative oil, bbl
- 43.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 30, 1988
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson, F.I. G-4-124914 | Monte Christo (48) | Hilcorp Energy Company | 1 | 0 | 43.5K | Jan 1993 – Jul 2026 |
| Johnson, F.I. G-4-128833 | Monte Christo ( 40) | Hilcorp Energy Company | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Jan 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 350099-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Aug 12, 1988 | Aug 16, 1988 | — | 7,850 |
| 336327-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Sep 22, 1987 | Sep 24, 1987 | — | 7,850 |
| 328453-98 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 23, 1987 | Apr 2, 1987 | — | 7,850 |
| 328453-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Mar 31, 1987 | Apr 2, 1987 | — | 7,850 |
| 305621-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Aug 22, 1986 | Aug 25, 1986 | — | 8,500 |
| 231619-99 | Drill | Superior Oil Company, The | Mar 6, 1984 | Mar 8, 1984 | Apr 26, 1984 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 30, 1988 | Johnson F.I. G-4-128833 | Monte Christo ( 40) | Hilcorp Energy Company | Shut In-Multi-Compl · shut in Jan 1, 1998 | 7,850 |
| Aug 2, 1987 | Johnson F.I. G-4-124914 | Monte Christo (48) | Hilcorp Energy Company | Temp Abandoned · shut in Jan 1, 1998 | 7,850 |
| Nov 9, 1987 | Johnson F.I. G-4-125665 | Monte Christo (42) | Mobil Producing TX. & N.M. Inc. | Not on Schedule | — |
| Sep 5, 1986 | Johnson F.I. G-4-122402 | Monte Christo (38-B) | Mobil Producing TX. & N.M. Inc. | Not on Schedule | — |
| May 19, 1984 | Johnson F. I. G-4-111157 | Monte Christo (39-A) | Mobil Producing TX. & N.M. Inc. | Not on Schedule | — |
| May 15, 1984 | Johnson F. I. G-4-110865 | Monte Christo (49) | Mobil Producing TX. & N.M. Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 221 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,936 | 6,942 | Perforated |
| 7,056 | 7,084 | Perforated |
| 7,201 | 7,204 | Perforated |
| 7,211 | 7,219 | Perforated |
| 7,229 | 7,232 | Perforated |
| 7,288 | 7,292 | Perforated |
| 7,694 | 7,711 | Perforated |
| 7,718 | 7,725 | Perforated |
| 7,742 | 7,752 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,840 | 13.5 | 895 sx |
| 9.625 | 1,840 | — | — |
| 2.875 | 7,850 | 8.75 | 1,755 sx |
| 2.875 | 7,850 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 6, 1988 | Nov 3, 1988 | Yes |
| 00 | Nov 14, 1988 | — | — |
| 00 | Jan 13, 1988 | Nov 23, 1987 | Yes |
| 00 | Dec 15, 1987 | — | — |
| 00 | Oct 29, 1987 | Aug 28, 1987 | Yes |
| 00 | Oct 8, 1987 | — | — |
| 00 | Dec 3, 1986 | Sep 19, 1986 | Yes |
| 00 | Nov 1, 1986 | — | Yes |
| 00 | Jul 5, 1984 | Jun 7, 1984 | — |
| 00 | Jul 3, 1984 | Jun 7, 1984 | — |
| 00 | Jun 20, 1984 | May 25, 1984 | — |
| 00 | Jun 15, 1984 | May 25, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-31454 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-31454 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21531454, documented in the API reference.