TEXAS · WELLS · HIDALGO COUNTY · HAMMAN, JOHN "B" LEASE · API 42-215-31456 · DISTRICT 04

Hamman John B #8

Shut in

Hidalgo County · Monte Christo (Vksbg JJ) field · Temp Abandoned  · Vertical

Hamman John B #8 (API 42-215-31456) is a well in Hidalgo County operated by Hilcorp Energy Company, completed July 6, 1984 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.

The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 12,000 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 6 formation tops, including F5 North, F10, F14b, F17.

Its lease has reported 95 barrels of oil and 321 mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Nov 2017
Latest permitMobil Producing TX. & N.M. Inc.Jun 27, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Jun 27, 1986
last permit issued
Jul 6, 1984
completed
95
cumulative oil, bbl
321
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2017 THROUGH Nov 2017

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 6, 1984
Shut in
Jan 1, 1998
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hamman, John "B" G-4-112203Monte Christo (Vksbg JJ)Hilcorp Energy Company195321Jan 1993 – Nov 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hilcorp Energy CompanyJun 2017 → Nov 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
303640-99RecompletionMobil Producing TX. & N.M. Inc.Jun 25, 1986Jun 27, 1986—12,000
232802-99DrillSuperior Oil Company, TheMar 16, 1984Mar 19, 1984May 7, 198413,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 6, 1984Hamman John B G-4-112203Monte Christo (Vksbg JJ)Hilcorp Energy CompanyTemp Abandoned · shut in Jan 1, 199812,000

Formation tops

As filed on W-2/G-1. Subsea from 179 ft elevation.Download CSV →

FormationMD ftSubsea
F5 North7,685-7,506
F108,247-8,068
F14B8,840-8,661
F179,680-9,501
GG11,204-11,025
JJ11,600-11,421

Perforations

Perforated and open-hole intervals.

FromToType
11,60211,622Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,850181,360 sx
9.62510,053121,575 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 11, 1984Aug 28, 1984—
00Sep 8, 1984Aug 28, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531456, documented in the API reference.