WELL · 42-215-31466 · DISTRICT 4

A. Longoria G.U. 2 #2

N

Hidalgo County · Tabasco (X) field  · Directional

A. Longoria G.U. 2 #2 (API 42-215-31466) is a well in Hidalgo County operated by Smith Production Inc., completed January 6, 1992.

The RRC has issued 3 drilling permits between 1984 and 2001, permitted to 11,500 ft.

Completion filings report 8 formation tops, including Mission, Heard, Tabasco 'R', Tabasco R.

No lease production has been reported under this well’s leases.

Operator of record

Smith Production Inc.

Based in
The Woodlands, TX
P-5 status
Active (A)
P-5 last filed
Nov 12, 2025
Permits on file
433
Phone
(281) 296-5600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSmith Production Inc.
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitSmith Production Inc.Jul 20, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
3
permits on file
Jul 20, 2001
last permit issued
Jan 6, 1992
completed
0
cumulative oil, bbl
892K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 6, 1992
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
A. Longoria Gas Unit G-4-183936Tabasco (U)Hilcorp Energy Company10269KJun 2001 – Jul 2026
A. Longoria G.U. 2 G-4-140568Tabasco (X)Smith Production Inc.10623KJan 1993 – Jun 2001
— G-4-111420——000—

Gas, mcf lease total

Last 12 months 9,446 · prior 12 6,624(+43%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco Oil & Gas Co.Jan 1993 → Feb 1994
  2. 2Vastar Resources, Inc.Mar 1994 → Jan 1999
  3. 3Smith Production Inc.Feb 1999 → Apr 2005
  4. 4Fidelity Explor. & Prod. Co.May 2005 → Sep 2014
  5. 5Hilcorp Energy CompanyOct 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
511529-99RecompletionSmith Production Inc.Jul 17, 2001Jul 20, 2001Mar 30, 200110,496
393185-99RecompletionArco Oil & Gas Co.Oct 23, 1991Oct 25, 1991Nov 27, 199110,496
234602-99DrillArco Oil & Gas Co.Mar 30, 1984Apr 5, 1984Apr 12, 198411,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-111420————
—— G-4-140568————
—— G-4-183936————

Formation tops

As filed on W-2/G-1. Subsea from 192 ft elevation.Download CSV →

FormationMD ftSubsea
Mission5,774-5,582
Heard5,989-5,797
Tabasco 'R'7,109-6,917
Tabasco R7,109-6,917
Tabasco 'X'8,364-8,172
Tabasco X8,364-8,172
Tabasco 'Y'9,449-9,257
Tabasco Y9,449-9,257

Perforations

Perforated and open-hole intervals.

FromToType
8,1988,212Perforated
8,2188,228Perforated
8,6658,718Perforated
9,4499,516Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.751,99417.51,560 sx
9.6257,27112.251,025 sx
79,1218.5300 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 2001Jul 17, 2001Yes
00Aug 30, 2001——
00Apr 28, 1992Mar 31, 1992—
00Mar 9, 1992Jan 31, 1992Yes
00Feb 13, 1992——
00Jul 25, 1984Jul 11, 1984—
00Jul 20, 1984Jul 11, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531466, documented in the API reference.