WELL · 42-215-31542 · DISTRICT 4

Garcia L&L #2

Plugged

Hidalgo County · NICHOLS(3775) field  · Vertical

Garcia L&L #2 (API 42-215-31542) is a plugged well in Hidalgo County, plugged May 8, 2025, last operated by Esenjay Petroleum Corp..

The RRC has issued 3 drilling permits between 1984 and 1991, permitted to 3,710 ft.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.

Operator of record

Esenjay Petroleum Corp.

Based in
Corpus Chrsti, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 31, 1998
Permits on file
381
Phone
(512) 883-7464

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEsenjay Petroleum Corp.
Production reportsFargo Oil & Gas, LLCthrough May 2023
Latest permitEsenjay Petroleum Corp.Sep 20, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,710
total depth, ft
3
permits on file
Sep 20, 1991
last permit issued
Nov 29, 1984
completed
0
cumulative oil, bbl
177K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 29, 1984
Shut in
—
Plugged
May 8, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garcia, L. & L. G-4-139368Nichols (2800)Fargo Oil & Gas, LLC10177KJan 1993 – May 2025
— G-4-132138——000—

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Falcon Production Co.Jan 1993 → Dec 1997
  2. 2Ress Production Co.Jan 1998 → Jul 1999
  3. 3Greehey & Company, Ltd.Aug 2005 → Dec 2007
  4. 4Reveille ResourcesJan 2008 → Feb 2010
  5. 5Reveille Resources (Texas), Inc.Mar 2010 → May 2012
  6. 6Bruington Operating, L.L.C.Jun 2012 → Jun 2014
  7. 7Fordyce Oil & GasJul 2014 → May 2020
  8. 8Fordyce Oil & Gas, LLCAug 2020 → Nov 2021
  9. 9Fargo Oil & Gas, LLCDec 2021 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391143-99RecompletionEsenjay Petroleum Corp.Aug 22, 1991Sep 20, 1991Jul 1, 19913,710
359015-99RecompletionEsenjay Petroleum Corp.May 8, 1989Aug 16, 1989—3,710
253965-99DrillEsenjay Petroleum Corp.Feb 12, 1985Oct 5, 1984Oct 30, 19843,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-132138————
—— G-4-139368————

Formation tops

As filed on W-2/G-1. Subsea from 141 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE2,750-2,609
FrioFIRST FRIO3,100-2,959
FrioMIDDLE FRIO3,370-3,229

Perforations

Perforated and open-hole intervals.

FromToType
2,5482,570Perforated
2,6962,737Perforated
3,5843,587Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538912.25160 S
4.53,7107.875785 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 23, 1991Sep 20, 1991Yes
00Oct 2, 1991——
00Jan 2, 1990Mar 21, 1989Yes
00Oct 21, 1989——
00Apr 4, 1985Dec 14, 1984—
00Apr 2, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531542, documented in the API reference.