TEXAS · WELLS · HIDALGO COUNTY · API 42-215-31640 · DISTRICT 04

Hamman John B #21D

Plugged

Hidalgo County · Monte Christo (F-4) field  · Vertical

Hamman John B #21D (API 42-215-31640) is a plugged well in Hidalgo County, plugged December 27, 2012, last operated by Mobil Producing TX. & N.M. Inc..

The RRC has issued 4 drilling permits between 1985 and 1995, permitted to 9,200 ft.

Completion filings report 4 formation tops, including F-5, F-6, F-8, F-12.

Operator of record

Mobil Producing TX. & N.M. Inc.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jun 4, 2025
Permits on file
6,763
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMobil Producing TX. & N.M. Inc.through Mar 1995
Latest permitMobil Producing TX. & N.M. Inc.Feb 14, 1995
9,200
total depth, ft
4
permits on file
Feb 14, 1995
last permit issued
Apr 9, 1990
completed
0
cumulative oil, bbl
32.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 9, 1990
Shut in
—
Plugged
Dec 27, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hamman, John "B" G-4-119621Monte Christo (Frio F-5)Newfield Exploration Company1032.2KJan 1993 – Dec 2012
Hamman, John "B" G-4-137562Monte Christo (F-4)Mobil Producing TX. & N.M. Inc.100Jan 1993 – Apr 2003
— G-4-127133——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Mar 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
432911-99RecompletionMobil Producing TX. & N.M. Inc.Feb 14, 1995Feb 14, 1995—8,650
371349-99RecompletionMobil Producing TX. & N.M. Inc.Mar 23, 1990Mar 23, 1990—8,650
343779-99RecompletionMobil Producing TX. & N.M. Inc.Mar 11, 1988Mar 15, 1988—8,650
281504-99DrillSuperior Oil Company, TheOct 28, 1985Jul 31, 1985—9,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 9, 1990Hamman John B G-4-137562Monte Christo (F-4)Mobil Producing TX. & N.M. Inc.Plugged—
Mar 31, 1988Hamman John B G-4-127133Monte Christo (F-6)Mobil Producing TX. & N.M. Inc.Plugged—
Dec 22, 1985Hamman John B G-4-119621Monte Christo (Frio Cons.)Newfield Exploration CompanyPlugged—
Nov 22, 1985Hamman John B G-4-119622Monte Christo (F-8)Mobil Producing TX. & N.M. Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 185 ft elevation.Download CSV →

FormationMD ftSubsea
F-57,800-7,615
F-67,850-7,665
F-88,114-7,929
F-128,498-8,313

Perforations

Perforated and open-hole intervals.

FromToType
7,6997,719Perforated
7,8007,844Perforated
7,9287,940Perforated
7,9397,969Perforated
8,1148,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
9.6251,85212.25560 S
9.6251,852——
2.8758,6488.752,417 S
2.8758,648——
2.8758,6508.752,417 S
2.8758,650——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 20, 1991May 14, 1990Yes
00Apr 8, 1991——
00Jun 16, 1988May 4, 1988Yes
00Jun 4, 1988——
00Feb 26, 1986Feb 6, 1986Yes
00Feb 3, 1986Jan 16, 1986Yes
00Jan 23, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531640, documented in the API reference.