WELL · 42-215-31641 · DISTRICT 4

Hamman Unit A #4F

Plugged

Hidalgo County · Monte Christo (Frio Cons.) field  · Vertical

Hamman Unit A #4F (API 42-215-31641) is a plugged well in Hidalgo County, plugged June 7, 2011, last operated by Mobil Producing TX. & N.M. Inc..

The RRC has issued 2 drilling permits between 1985 and 1998, permitted to 10,100 ft.

Completion filings report one formation top, including Frio.

Operator of record

Mobil Producing TX. & N.M. Inc.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jun 4, 2025
Permits on file
6,763
Phone
(346) 474-9142

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsMobil Producing TX. & N.M. Inc.through Oct 2008
Latest permitMobil Producing TX. & N.M. Inc.Jun 23, 1998
10,100
total depth, ft
2
permits on file
Jun 23, 1998
last permit issued
Dec 2, 1998
completed
0
cumulative oil, bbl
353K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 2, 1998
Shut in
—
Plugged
Jun 7, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hamman Unit "A" G-4-169902Monte Christo (Frio Cons.)Mobil Producing TX. & N.M. Inc.1062KJul 1998 – Jun 2011
Hamman Unit "A" G-4-119984Monte Christo (F-6)Mobil Producing TX. & N.M. Inc.10200KJan 1993 – Apr 2003
Hamman Unit "A" G-4-119502Monte Christo (Frio F-9)Mobil Producing TX. & N.M. Inc.1090.7KJan 1993 – Jul 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Oct 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
477380-99RecompletionMobil Producing TX. & N.M. Inc.Jun 23, 1998Jun 23, 1998Jul 30, 199810,100
281626-99DrillSuperior Oil Company, TheOct 28, 1985Aug 2, 1985Sep 18, 198510,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 2, 1998Hamman Unit A G-4-169902Monte Christo (Frio Cons.)Mobil Producing TX. & N.M. Inc.Plugged—
Jan 11, 1986Hamman Unit A G-4-119984Monte Christo (F-6)Mobil Producing TX. & N.M. Inc.Plugged—
Dec 22, 1985Hamman Unit A G-4-119502Monte Christo (Frio F-9)Mobil Producing TX. & N.M. Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 184 ft elevation.Download CSV →

FormationMD ftSubsea
FrioFRIO F-68,016-7,832
FrioFRIO F-98,230-8,046
FrioFRIO F-138,960-8,776

Perforations

Perforated and open-hole intervals.

FromToType
8,0168,052Perforated
8,1088,148Perforated
8,3448,386Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1660——
10.6251,871——
9.6251,87112.25560 S
9.6251,871——
2.8759,5848.752,563 S
2.8759,584——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 1999Apr 23, 1999—
00Feb 25, 1999Jan 21, 1999—
00Oct 28, 1998Sep 18, 1998Yes
00Sep 24, 1998——
00Apr 3, 1986Mar 17, 1986Yes
00Mar 3, 1986Feb 11, 1986Yes
00Feb 19, 1986——
00Jan 16, 1986Jan 7, 1986Yes
00Jan 14, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531641, documented in the API reference.