TEXAS · WELLS · HIDALGO COUNTY · API 42-215-31726 · DISTRICT 04
Johnson -A- #2
Hidalgo County · Monte Christo (43-57 Cons.) field · Vertical
Johnson -A- #2 (API 42-215-31726) is a plugged well in Hidalgo County, plugged January 10, 2012, last operated by Cantera Operating LLC.
The RRC has issued 2 drilling permits between 1986 and 1994, permitted to 9,500 ft.
It was permitted by Texaco E & P Inc. and has since transferred to Cantera Operating LLC on the wellbore schedule.
Operator of record
Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.
- Based in
- The Woodlands, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 2016
- Permits on file
- 117
- Phone
- (832) 246-6100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cantera Operating LLC |
| Production reports | El Paso E & P Company, L. P.through Oct 2011 |
| Latest permit | Texaco E & P Inc.Oct 24, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 2
- permits on file
- Oct 24, 1994
- last permit issued
- Oct 26, 1994
- completed
- 0
- cumulative oil, bbl
- 592K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 26, 1994
- Shut in
- —
- Plugged
- Jan 10, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson -A- G-4-151968 | Monte Christo (50-B, South) | Cantera Operating, LLC | 1 | 0 | 575K | Oct 1994 – Sep 2014 |
| Johnson "A" G-4-123792 | Monte Christo (57 South) | Texaco E & P Inc. | 1 | 0 | 17.5K | Jan 1993 – Sep 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Mar 2000
- 2Coastal Oil & Gas CorporationApr 2000 → Jun 2001
- 3El Paso Production Oil & Gas Co.Jul 2001 → Feb 2004
- 4El Paso E & P Company, L. P.Oct 2011 → Oct 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 429311-99 | Recompletion | Texaco E & P Inc. | Oct 21, 1994 | Oct 24, 1994 | Oct 17, 1994 | 8,900 |
| 322918-99 | Drill | Tana Oil & Gas Corp. | Nov 10, 1986 | Nov 12, 1986 | — | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 26, 1994 | Johnson -A- G-4-151968 | Monte Christo (43-57 Cons.) | Cantera Operating LLC | Plugged | — |
| Mar 2, 1987 | Johnson A G-4-123792 | Monte Christo (57 South) | Texaco E & P Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,276 | 8,286 | Perforated |
| 8,310 | 8,330 | Perforated |
| 8,366 | 8,386 | Perforated |
| 8,448 | 8,464 | Perforated |
| 8,828 | 8,918 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,014 | 12.25 | 725 S |
| 4.5 | 9,265 | 7.875 | 1,188 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 29, 1995 | Dec 19, 1994 | Yes |
| 00 | Dec 23, 1994 | — | — |
| 00 | May 20, 1987 | Apr 6, 1987 | Yes |
| 00 | Apr 23, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-31726 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-31726 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21531726, documented in the API reference.