TEXAS · WELLS · HIDALGO COUNTY · PAGE, R.C. GAS UNIT #1 LEASE · API 42-215-31795 · DISTRICT 04
Page R.C. Gas Unit #1 #6
Hidalgo County · Tabasco (Consolidated) field · Vertical
- Fields on the latest permit · any of 6
- Tabasco (P) · Tabasco (S) · Tabasco (T) · Tabasco (U) · Tabasco (Vicksburg 10,000) · Tabasco (X)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Page R.C. Gas Unit #1 #6 (API 42-215-31795) is a plugged well in Hidalgo County, plugged November 5, 2025, last operated by Hilcorp Energy Company.
The RRC has issued one drilling permit, issued December 28, 1987, permitted to 11,000 ft.
It was permitted by Arco Oil & Gas CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 7 formation tops, including Mission, Heard, O Sand, R Sand.
Its lease has reported 10.4K barrels of oil and 1.07M mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Sep 2021 |
| Latest permit | Arco Oil & Gas Co.Dec 28, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 1
- permits on file
- Dec 28, 1987
- last permit issued
- Apr 21, 2006
- completed
- 10.4K
- cumulative oil, bbl
- 1.07M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 21, 2006
- Shut in
- —
- Plugged
- Nov 5, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Page, R.C. Gas Unit #1 G-4-126836 | Tabasco (Consolidated) | Hilcorp Energy Company | 1 | 10.4K | 1.07M | Jan 1993 – Sep 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arco Oil & Gas Co.Jan 1993 → Feb 1994
- 2Vastar Resources, Inc.Mar 1994 → Jan 1999
- 3Smith Production Inc.Feb 1999 → Apr 2005
- 4Fidelity Explor. & Prod. Co.May 2005 → Sep 2014
- 5Hilcorp Energy CompanyOct 2014 → Sep 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 340591-99 | Drill | Arco Oil & Gas Co. | Dec 23, 1987 | Dec 28, 1987 | — | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 21, 2006 | Page R.C. Gas Unit #1 G-4-126836 | Tabasco (Consolidated) | Hilcorp Energy Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 165 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Mission | 5,980 | -5,815 |
| Heard | 6,160 | -5,995 |
| O Sand | 6,860 | -6,695 |
| R Sand | 7,250 | -7,085 |
| U Sand | 8,100 | -7,935 |
| X Sand | 8,440 | -8,275 |
| VicksburgVICKSBURG 10,000 | 9,430 | -9,265 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,271 | 7,286 | Perforated |
| 7,301 | 7,361 | Perforated |
| 7,492 | 7,527 | Perforated |
| 7,715 | 7,814 | Perforated |
| 9,439 | 9,524 | Perforated |
| 9,800 | 9,813 | Perforated |
| 9,816 | 9,828 | Perforated |
| 9,834 | 9,848 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,007 | 17.5 | 1,170 S |
| 9.625 | 7,388 | 12.25 | 185 S |
| 2.875 | 10,047 | 6 | 500 S |
| 2.875 | 10,047 | 8.5 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 1, 2007 | Feb 9, 2007 | — |
| 00 | Aug 1, 1988 | Jul 6, 1988 | Yes |
| 00 | May 11, 1988 | Mar 18, 1988 | Yes |
| 00 | Apr 19, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-31795 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-31795 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21531795, documented in the API reference.