WELL · 42-215-31863 · DISTRICT 4
West Temple W. #34
Hidalgo County · Tabasco (Consolidated) field · Vertical
West Temple W. #34 (API 42-215-31863) is a plugged well in Hidalgo County, plugged April 26, 2010, last operated by Fidelity Explor. & Prod. CO..
The RRC has issued 2 drilling permits (amended once) between 1989 and 1994, permitted to 9,500 ft.
It was permitted by Vastar Resources, Inc. and has since transferred to Fidelity Explor. & Prod. CO. on the wellbore schedule.
Completion filings report 3 formation tops, including Heard, O Sand, T Sand.
Operator of record
Permitted by Vastar Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Denver, CO
- P-5 status
- Inactive (I)
- P-5 last filed
- Jun 20, 2016
- Permits on file
- 163
- Phone
- (720) 931-9631
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fidelity Explor. & Prod. Co. |
| Production reports | Smith Production Inc.through Jan 2001 |
| Latest permit | Vastar Resources, Inc.Mar 22, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 3
- permits on file
- Mar 22, 1994
- last permit issued
- May 23, 2001
- completed
- 0
- cumulative oil, bbl
- 503K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 23, 2001
- Shut in
- —
- Plugged
- Apr 26, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West, Temple W. G-4-151483 | Tabasco (N) | Fidelity Explor. & Prod. Co. | 1 | 0 | 487K | Oct 1994 – Apr 2010 |
| West, T.W. G-4-132229 | Tabasco (T) | Vastar Resources, Inc. | 1 | 0 | 16K | Jan 1993 – Oct 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Arco Oil & Gas Co.Jan 1993 → Feb 1994
- 2Vastar Resources, Inc.Mar 1994 → Jan 1999
- 3Smith Production Inc.Feb 1999 → Jan 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422273-98 | Recompletion | Vastar Resources, Inc. | May 12, 1994 | Mar 22, 1994 | Mar 2, 1994 | 8,610 |
| 422273-99 | Recompletion | Vastar Resources, Inc. | Mar 22, 1994 | Mar 22, 1994 | — | 7,900 |
| 360078-99 | Drill | Arco Oil & Gas Co. | Jun 5, 1989 | Jun 8, 1989 | — | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-132229 | — | — | — | — |
| — | — G-4-151483 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 170 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Heard | 5,980 | -5,810 |
| O Sand | 6,870 | -6,700 |
| T Sand | 7,903 | -7,733 |
| T Sand | 7,930 | -7,760 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,018 | 6,042 | Perforated |
| 6,762 | 6,784 | Perforated |
| 6,790 | 6,795 | Perforated |
| 8,249 | 8,286 | Perforated |
| 8,304 | 8,355 | Perforated |
| 8,406 | 8,440 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 14 | 56 | — | — |
| 9.625 | 2,003 | 12.25 | 595 S |
| 7 | 7,655 | 8.75 | 890 S |
| 2.875 | 8,602 | 6 | 332 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 6, 2001 | Jun 8, 2001 | — |
| 00 | Dec 12, 1994 | Oct 31, 1994 | Yes |
| 00 | Nov 1, 1994 | — | — |
| 00 | Nov 9, 1989 | Oct 18, 1989 | Yes |
| 00 | Oct 30, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-31863 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-31863 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21531863, documented in the API reference.