WELL · 42-215-31925 · DISTRICT 4

Goldston W.L. et AL #36

Plugged

Hidalgo County · Los Indios W. (P Sand West) field  · Vertical

Goldston W.L. ET AL #36 (API 42-215-31925) is a plugged well in Hidalgo County, plugged December 14, 1994, last operated by Union Pacific Resources Company.

The RRC has issued 2 drilling permits (amended once) between 1990 and 1991, permitted to 7,540 ft.

Completion filings report 4 formation tops, including H, N, G, P.

Operator of record

Union Pacific Resources Company

Based in
Fort Worth, TX
P-5 status
Inactive (I)
P-5 last filed
May 2, 2000
Permits on file
5,638
Phone
(817) 321-7424

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnion Pacific Resources Company
Production reportsnone
Latest permitUnion Pacific Resources CompanyApr 26, 1991
7,540
total depth, ft
3
permits on file
Apr 26, 1991
last permit issued
Apr 20, 1990
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1994

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 20, 1990
Shut in
—
Plugged
Dec 14, 1994

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldston, W.L. et AL G-4-135927Los Indios (N. Res. 3)Dalen Resources Oil & Gas Co.100Jan 1993 – Dec 1994
Goldston, W. L. et AL G-4-138199Los Indios (D)Dalen Resources Oil & Gas Co.100Jan 1993 – Dec 1994
— G-4-135482——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387213-99RecompletionUnion Pacific Resources CompanyApr 26, 1991Apr 26, 1991May 24, 19907,300
370306-98DrillUnion Pacific Resources CompanyMay 18, 1990Feb 26, 1990—7,300
370306-99DrillUnion Pacific Resources CompanyFeb 26, 1990Feb 26, 1990—7,540

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-135482————
—— G-4-135927————
—— G-4-138199————

Formation tops

As filed on W-2/G-1. Subsea from 91 ft elevation.Download CSV →

FormationMD ftSubsea
H6,416-6,325
N6,868-6,777
G6,880-6,789
P7,105-7,014
P7,106-7,015

Perforations

Perforated and open-hole intervals.

FromToType
5,8725,876Perforated
6,8686,874Perforated
7,1067,111Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,38313.5640 S
2.8757,294——
2.8757,2968.51,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 10, 1991May 3, 1991Yes
00Jun 3, 1991——
00Jan 3, 1991May 24, 1990Yes
00Nov 8, 1990——
00Oct 11, 1990May 24, 1990Yes
00Aug 31, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21531925, documented in the API reference.