TEXAS · WELLS · HIDALGO COUNTY · DOMINGUEZ, MAXIMO GU LEASE · API 42-215-32126 · DISTRICT 04

Dominguez Maximo GU #1

Plugged

Hidalgo County · Los Torritos N. field  · Vertical

Dominguez Maximo GU #1 (API 42-215-32126) is a plugged well in Hidalgo County, plugged November 6, 2007, last operated by Eog Resources Inc..

The RRC has issued one drilling permit, issued June 14, 1993, permitted to 11,500 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Eog Resources Inc. on the wellbore schedule.

Completion filings report one formation top, including Frio.

Its lease has reported 9.2K barrels of oil and 442K mcf of gas since August 1993, with no volume in the three years through April 2026.

Operator of record

EOG Resources Inc.

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through May 1996
Latest permitEnron Oil & Gas CompanyJun 14, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
1
permits on file
Jun 14, 1993
last permit issued
Jan 12, 1996
completed
9.2K
cumulative oil, bbl
442K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1993 THROUGH May 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 12, 1996
Shut in
—
Plugged
Nov 6, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dominguez, Maximo GU G-4-147624Los Torritos, N.EOG Resources, Inc.19.2K442KAug 1993 – May 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyDec 1993 → May 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
412760-99DrillEnron Oil & Gas CompanyJun 14, 1993Jun 14, 1993Jul 7, 199311,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 12, 1996Dominguez Maximo GU G-4-147624Los Torritos N.EOG Resources Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 83 ft elevation.Download CSV →

FormationMD ftSubsea
FrioMIDDLE FRIO8,090-8,007
FrioLOWER FRIO9,025-8,942

Perforations

Perforated and open-hole intervals.

FromToType
9,0449,178Perforated
9,6069,732Perforated
9,7629,911Perforated
9,95810,302Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,99012.25725 S
78,8058.75390 S
2.87510,6004.125100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 27, 2004Aug 2, 2004—
00Mar 27, 1996Jan 25, 1996—
00Feb 8, 1994Dec 29, 1993Yes
00Jan 10, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532126, documented in the API reference.