WELL · 42-215-32194 · DISTRICT 4

West Temple W. #35

Plugged

Hidalgo County · Tabasco (Consolidated) field  · Directional

West Temple W. #35 (API 42-215-32194) is a plugged well in Hidalgo County, plugged October 24, 2013, last operated by Fidelity Explor. & Prod. CO..

The RRC has issued 3 drilling permits between 1994 and 2000, permitted to 9,260 ft.

It was permitted by Smith Production Inc. and has since transferred to Fidelity Explor. & Prod. CO. on the wellbore schedule.

Completion filings report 3 formation tops, including Heard, L, M.

Operator of record

Fidelity Explor. & Prod. Co.

Permitted by Smith Production Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Inactive (I)
P-5 last filed
Jun 20, 2016
Permits on file
163
Phone
(720) 931-9631

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFidelity Explor. & Prod. Co.
Production reportsFidelity Explor. & Prod. Co.through Mar 2011
Latest permitSmith Production Inc.Dec 5, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,260
total depth, ft
3
permits on file
Dec 5, 2000
last permit issued
Nov 2, 2000
completed
0
cumulative oil, bbl
792K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1995 THROUGH Oct 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 2, 2000
Shut in
—
Plugged
Oct 24, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West, Temple W. G-4-181320Tabasco (M)Fidelity Explor. & Prod. Co.10157KNov 2000 – Oct 2013
West, T. W. G-4-174277Tabasco (Heard FB 2)Smith Production Inc.10263KAug 1999 – Jun 2001
West, T. W. G-4-154063Tabasco (M)Smith Production Inc.10372KJan 1995 – Oct 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Vastar Resources, Inc.Jan 1995 → Jan 1999
  2. 2Smith Production Inc.Feb 1999 → Apr 2005
  3. 3Fidelity Explor. & Prod. Co.May 2005 → Mar 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
502484-99RecompletionSmith Production Inc.Nov 30, 2000Dec 5, 2000Oct 5, 20008,260
487169-99RecompletionSmith Production Inc.Sep 1, 1999Sep 15, 1999Aug 1, 19998,260
428702-99DrillVastar Resources, Inc.Sep 30, 1994Oct 6, 1994Nov 9, 19949,260

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-154063————
—— G-4-174277————
—— G-4-181320————

Formation tops

As filed on W-2/G-1. Subsea from 177 ft elevation.Download CSV →

FormationMD ftSubsea
Heard6,150-5,973
L6,810-6,633
M7,100-6,923

Perforations

Perforated and open-hole intervals.

FromToType
6,2866,330Perforated
6,3426,365Perforated
7,3127,324Perforated
7,3127,454Perforated
7,3367,354Perforated
7,3627,386Perforated
7,4067,420Perforated
7,4387,454Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,02514.751,120 S
7.6256,6509.875465 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 21, 2001Feb 14, 2001Yes
00Mar 23, 2001——
00Oct 21, 1999Sep 2, 1999Yes
00Sep 29, 1999——
00Nov 8, 1995Feb 24, 1995—
00Sep 28, 1995Jan 30, 1995Yes
00May 26, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.