WELL · 42-215-32326 · DISTRICT 4

Longoria #3

Plugged

Hidalgo County · San Ramon (8550) field  · Vertical

Longoria #3 (API 42-215-32326) is a plugged well in Hidalgo County, plugged October 12, 2012, last operated by Bass Enterprises Production CO..

The RRC has issued 3 drilling permits (amended twice) between 1996 and 1999, permitted to 12,000 ft.

Completion filings report one formation top, including See Original Form G-1.

Operator of record

Bass Enterprises Production Co.

Based in
Fort Worth, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 25, 2006
Permits on file
801
Phone
(817) 390-8400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBass Enterprises Production Co.
Production reportsVirtex Operating Company, Inc.through Jun 2011
Latest permitBass Enterprises Production Co.Jan 19, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
5
permits on file
Jan 19, 1999
last permit issued
Mar 7, 1998
completed
0
cumulative oil, bbl
563K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1997 THROUGH Oct 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 7, 1998
Shut in
—
Plugged
Oct 12, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Longoria G-4-171795San Ramon (8300)Virtex Operating Company, Inc.10271KJan 1999 – Oct 2012
Longoria G-4-167514San Ramon (8550)Bass Enterprises Production Co.10113KMar 1998 – Jan 1999
Longoria G-4-162608McAllen Ranch (Vicksburg N)Bass Enterprises Production Co.10179KMar 1997 – Mar 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bass Enterprises Production Co.Mar 1997 → Oct 2000
  2. 2Virtex Petroleum Company, Inc.Nov 2000 → Jan 2008
  3. 3Virtex Operating Company, Inc.Feb 2008 → Jun 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
482068-99RecompletionBass Enterprises Production Co.Jan 15, 1999Jan 19, 1999Jan 18, 199911,430
471465-98RecompletionBass Enterprises Production Co.Apr 1, 1998Jan 15, 1998Feb 4, 199811,430
471465-99RecompletionBass Enterprises Production Co.Dec 19, 1997Jan 15, 1998—11,430
450082-98DrillBass Enterprises Production Co.Apr 7, 1997Jul 11, 1996—11,430
450082-99DrillBass Enterprises Production Co.Jul 8, 1996Jul 11, 1996Aug 26, 199612,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-162608————
—— G-4-167514————
—— G-4-171795————

Formation tops

As filed on W-2/G-1. Subsea from 196 ft elevation.Download CSV →

FormationMD ftSubsea
See Original Form G-1——

Perforations

Perforated and open-hole intervals.

FromToType
8,0908,102Perforated
8,3018,356Perforated
8,5648,571Perforated
9,6829,700Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,79717.51,290 S
9.6257,98012.251,240 S
5.511,4306.5370 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 13, 2003Sep 25, 2003—
00Feb 25, 1999Feb 1, 1999Yes
00Feb 16, 1999——
00May 19, 1998Apr 1, 1998Yes
00Apr 16, 1998——
00May 8, 1997Apr 3, 1997Yes
00May 1, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532326, documented in the API reference.