TEXAS · WELLS · HIDALGO COUNTY · GUERRA, A. "B" LEASE · API 42-215-32420 · DISTRICT 04

Guerra A. B #9

Shut in

Hidalgo County · La Reforma field · Temp Abandoned  · Vertical

Guerra A. B #9 (API 42-215-32420) is a well in Hidalgo County operated by Orx Resources L.L.C., completed July 18, 1997 and listed as temp abandoned on the RRC schedule, shut in June 1, 2003.

The RRC has issued one drilling permit, issued May 7, 1997, permitted to 7,500 ft.

It was permitted by Tesoro E&P Company, L.P. and has since transferred to Orx Resources L.L.C. on the wellbore schedule.

Completion filings report 3 formation tops, including G, L, N.

Its lease has reported 27 barrels of oil and 166K mcf of gas since July 1997, with no volume in the three years through April 2026.

Operator of record

Orx Resources L.L.C.

Permitted by Tesoro E&P Company, L.P.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Sep 2, 2025
Permits on file
1
Phone
(346) 444-3320

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOrx Resources L.L.C.
Production reportsOrx Resources, L.L.C.through Nov 2004
Latest permitTesoro E&P Company, L.P.May 7, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
1
permits on file
May 7, 1997
last permit issued
Jul 18, 1997
completed
27
cumulative oil, bbl
166K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Nov 2004

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 18, 1997
Shut in
Jun 1, 2003
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guerra, A. "B" G-4-165030La ReformaOrx Resources, L.L.C.127166KJul 1997 – Nov 2004

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tesoro E&P Company, L.P.Jul 1997 → Aug 1997
  2. 2Wynn-Crosby Energy, Inc.Sep 1997 → Nov 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
461898-99DrillTesoro E&P Company, L.P.May 2, 1997May 7, 1997May 21, 19977,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 18, 1997Guerra A. B G-4-165030La ReformaOrx Resources L.L.C.Temp Abandoned · shut in Jun 1, 20037,500

Formation tops

As filed on W-2/G-1. Subsea from 243 ft elevation.Download CSV →

FormationMD ftSubsea
G6,235-5,992
L7,062-6,819
N7,395-7,152

Perforations

Perforated and open-hole intervals.

FromToType
7,0677,080Perforated
7,0887,092Perforated
7,1407,146Perforated
7,1947,200Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,50513.51,221 S
2.8757,4998.75777 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 18, 1997Oct 20, 1997Yes
00Nov 4, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532420, documented in the API reference.