TEXAS · WELLS · HIDALGO COUNTY · API 42-215-32456 · DISTRICT 04

Beaurline A. W. #24

Plugged

Hidalgo County · McAllen Ranch (Vicksburg S E.) field  · Vertical

Beaurline A. W. #24 (API 42-215-32456) is a plugged well in Hidalgo County, plugged March 12, 2012, last operated by Oxy USA Inc..

The RRC has issued one drilling permit (amended twice), issued July 28, 1997, permitted to 14,000 ft.

It was permitted by Shell Western E&P Inc. and has since transferred to Oxy USA Inc. on the wellbore schedule.

Completion filings report one formation top, including Y1.

Operator of record

OXY USA Inc.

Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 26, 2026
Permits on file
3,316
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA Inc.
Production reportsShell Western E&Pthrough Jul 2000
Latest permitShell Western E&P Inc.Jul 28, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
3
permits on file
Jul 28, 1997
last permit issued
Apr 1, 1998
completed
0
cumulative oil, bbl
1.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1998 THROUGH Mar 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 1998
Shut in
—
Plugged
Mar 12, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beaurline, A. W. G-4-168906McAllen Ranch (Vicksburg y, E.)OXY USA Inc.101.17MFeb 1998 – Mar 2012
Beaurline, A. W. G-4-169024McAllen Ranch (Vicksburg S, E.)OXY USA Inc.100Apr 1998 – Mar 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Feb 1998 → Nov 1999
  2. 2Shell Western E&PJul 2000 → Jul 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465495-97DrillShell Western E&P Inc.Mar 16, 1998Jul 28, 1997Feb 9, 199814,000
465495-98DrillShell Western E&P Inc.Aug 11, 1997Jul 28, 1997—14,000
465495-99DrillShell Western E&P Inc.Jul 28, 1997Jul 28, 1997—14,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 1, 1998Beaurline A. W. G-4-169024McAllen Ranch (Vicksburg S E.)OXY USA Inc.Plugged—
Feb 10, 1998Beaurline A. W. G-4-168906McAllen Ranch (Vicksburg y E.)OXY USA Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 104 ft elevation.Download CSV →

FormationMD ftSubsea
Y112,845-12,741

Perforations

Perforated and open-hole intervals.

FromToType
11,94611,952Perforated
11,95411,962Perforated
12,23812,244Perforated
12,27212,276Perforated
12,86612,870Perforated
12,86612,880Perforated
12,87612,880Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,42617.51,600 S
9.6258,58412.251,671 S
3.513,1364.75700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 1998Mar 23, 1998Yes
00Aug 5, 1998May 12, 1998Yes
00Jul 29, 1998——
00Jul 23, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532456, documented in the API reference.