WELL · 42-215-32470 · DISTRICT 4

Edinburg Unit #4

Y

Hidalgo County · Edinburg ( 9 950) field · Temp Abandoned  · Directional

Edinburg Unit #4 (API 42-215-32470) is a well in Hidalgo County operated by Royal Production Company Inc., completed March 18, 2011 and listed as temp abandoned on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1997 and 2011, permitted to 11,882 ft.

Completion filings report 6 formation tops, including Carlson, Tex Miss, Tex. Miss, L Hansen.

No lease production has been reported under this well’s leases.

Operator of record

Royal Production Company Inc.

Based in
Corpus Christ, TX
P-5 status
Active (A)
P-5 last filed
Jan 29, 2026
Permits on file
235
Phone
(361) 888-4792

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRoyal Production Company Inc.
Production reportsRoyal Production Company, Inc.through Dec 2025
Latest permitRoyal Production Company, Inc.Apr 18, 2011
11,882
total depth, ft
3
permits on file
Apr 18, 2011
last permit issued
Mar 18, 2011
completed
0
cumulative oil, bbl
7.73M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 18, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Edinburg Unit G-4-168718Edinburg, S. (Marks 11030)Royal Production Company, Inc.107.22MDec 1997 – Jul 2026
Edinburg Unit G-4-261880Edinburg ( 9,950)Royal Production Company, Inc.10514KMar 2011 – Jul 2026

Gas, mcf lease total

Last 12 months 9,468 · prior 12 22,492(-58%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Royal Production Company, Inc.Jan 1998 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
713422-99RecompletionRoyal Production Company, Inc.Apr 1, 2011Apr 18, 2011Mar 14, 201111,882
467706-98DrillRoyal Production Company, Inc.Mar 4, 1998Sep 18, 1997Sep 27, 199711,800
467706-99DrillRoyal Production Company, Inc.Sep 18, 1997Sep 18, 1997—11,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-168718————
—— G-4-261880————

Formation tops

As filed on W-2/G-1. Subsea from 100 ft elevation.Download CSV →

FormationMD ftSubsea
Carlson7,760-7,660
Tex Miss9,100-9,000
Tex. Miss9,100-9,000
L Hansen10,560-10,460
L. Hansen10,560-10,460
Marks11,094-10,994

Perforations

Perforated and open-hole intervals.

FromToType
9,7829,797Perforated
9,8029,812Perforated
11,09411,098Perforated
11,09411,156Perforated
11,11111,134Perforated
11,13811,156Perforated
11,23511,241Perforated
11,23511,294Perforated
11,27811,281Perforated
11,28411,294Perforated
11,29911,320Perforated
11,33711,347Perforated
11,37611,380Perforated
11,38811,400Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,69514.75860 S
7.6259,0909.875440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 23, 2012May 4, 2011—
00Aug 17, 2005Mar 17, 2005—
00Jul 19, 2004May 17, 2004—
00Oct 12, 1999Sep 15, 1999—
00Jul 21, 1998Feb 10, 1998Yes
00Jul 9, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532470, documented in the API reference.