TEXAS · WELLS · HIDALGO COUNTY · MCALLEN, A. A. LEASE · API 42-215-32520 · DISTRICT 04

McAllen A. A. #97

Y

Hidalgo County · McAllen Ranch (Vksbg P-V S Cons) field · Producing  · Vertical

Mcallen A. A. #97 (API 42-215-32520) is a well in Hidalgo County operated by Merit Energy Company, completed November 10, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 10, 1998, permitted to 12,092 ft.

It was permitted by Shell Western E&P Inc. and has since transferred to Merit Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Vx S, Vx S1, Vx S2.

Its lease has reported 87.9K barrels of oil and 5.25M mcf of gas since September 1998, last reporting volume in April 2026.

Operator of record

Merit Energy Company

Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsMerit Energy Companythrough Apr 2026
Latest permitShell Western E&P Inc.Mar 10, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,092
total depth, ft
1
permits on file
Mar 10, 1998
last permit issued
Nov 10, 2003
completed
87.9K
cumulative oil, bbl
5.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1998 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 10, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McAllen, A. A. G-4-170905McAllen Ranch (Vksbg P-V,s Cons)Merit Energy Company187.9K5.25MSep 1998 – Apr 2026

Gas, mcf lease total

Last 12 months 20,321 · prior 12 21,528(-6%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Oct 1998 → Feb 2000
  2. 2Shell Western E&PMar 2000 → Apr 2011
  3. 3OXY USA Inc.May 2011 → Jul 2017
  4. 4Merit Energy CompanyAug 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
474214-99DrillShell Western E&P Inc.Mar 10, 1998Mar 10, 1998Aug 15, 199813,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 10, 2003McAllen A. A. G-4-170905McAllen Ranch (Vksbg P-V S Cons)Merit Energy CompanyProducing12,092

Formation tops

As filed on W-2/G-1. Subsea from 159 ft elevation.Download CSV →

FormationMD ftSubsea
VX S11,628-11,469
VX S111,799-11,640
VX S211,972-11,813

Perforations

Perforated and open-hole intervals.

FromToType
11,67211,678Perforated
11,67211,696Perforated
11,69011,696Perforated
11,90711,909Perforated
11,92011,922Perforated
11,97811,986Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,83517.51,150 S
9.6259,15812.251,627 S
3.512,0346.5750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 15, 2003Nov 20, 2003—
00Dec 16, 1998Nov 12, 1998Yes
00Dec 3, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532520, documented in the API reference.