TEXAS · WELLS · HIDALGO COUNTY · API 42-215-32740 · DISTRICT 04

West Temple W. #36

Shut in

Hidalgo County · Tabasco (Consolidated) field · Producing  · Vertical

Fields on the latest permit · any of 29
Tabasco (E) · Tabasco (E Sand FB 3) · Tabasco (F Sand) · Tabasco (F-Sand FB-1) · Tabasco (Frio King) · Tabasco (G) · Tabasco (G 1) · Tabasco (H) · Field 88103275 · Tabasco (Heard FB 2) · Tabasco (Heard FB 3) · Tabasco (I-1) · Tabasco (M) · Tabasco (Mission) · Tabasco (N) · Tabasco (O) · Tabasco (O Seg 1) · Tabasco (O Seg 2) · Tabasco (P) · Tabasco (R) · Tabasco (S) · Tabasco (Vicksburg 7000 Lower) · Field 88103850 · Tabasco (4350 Sand) · Tabasco (6700) · Tabasco, North (a Sand) · Field 88105250 · Tabasco, North (Heard) · Tabasco, North (K)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

West Temple W. #36 (API 42-215-32740) is a well in Hidalgo County operated by Hilcorp Energy Company, completed January 25, 2001 and listed as producing on the RRC schedule, shut in December 1, 2003.

The RRC has issued one drilling permit, issued March 20, 2000, permitted to 7,600 ft.

It was permitted by Smith Production Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Mission, Heard, K, L.

Its 2 leases have reported 2.78K barrels of oil and 57.4K mcf of gas since September 2000, with no volume in the three years through August 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Smith Production Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,460
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Nov 2003
Latest permitSmith Production Inc.Mar 20, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,600
total depth, ft
1
permits on file
Mar 20, 2000
last permit issued
Jan 25, 2001
completed
2.78K
cumulative oil, bbl
57.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · SEP 2000 THROUGH NOV 2003

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 25, 2001
Shut in
Dec 1, 2003
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West, Temple W. G-4-179288Tabasco (Consolidated)Hilcorp Energy Company12.78K57.4KSep 2000 – Nov 2003
West, Temple W. G-4-199823Tabasco (Consolidated)Hilcorp Energy Company100Mar 2002 – —

No volumes reported on these leases in the last three years.

Wells named West Temple W.

Hilcorp Energy Company's other wells filed under this lease name in Hidalgo County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Operator on the lease's P-4

Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.

OperatorFromTo
Hilcorp Energy CompanyOct 1, 2014today
Fidelity Explor. & Prod. Co.May 1, 2005Oct 1, 2014
Smith Production Inc.Nov 18, 2004May 1, 2005

Reporting production

Every operator that reported production on this well's lease, in order.

  1. 1Smith Production Inc.Sep 2000 → Nov 2003

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
492679-99DrillSmith Production Inc.Mar 3, 2000Mar 20, 2000Aug 21, 20007,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 25, 2001West Temple W. G-4-199823Tabasco (Consolidated)Hilcorp Energy CompanyProducing · shut in Mar 1, 20027,600
Jan 25, 2001West Temple W. G-4-179288Tabasco (Consolidated)Hilcorp Energy CompanyTemp Abandoned · shut in Dec 1, 20037,600

Formation tops

As filed on W-2/G-1. Subsea from 177 ft elevation.Download CSV →

FormationMD ftSubsea
Mission6,000-5,823
Heard6,350-6,173
K6,800-6,623
L7,000-6,823
M7,300-7,123

Perforations

Perforated and open-hole intervals.

FromToType
5,3605,366Perforated
6,8236,898Perforated
6,9227,044Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,53512.251,143 S
8.6252,535—666 S
4.57,6047.875648 S
4.57,604—648 S
9.625———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 12, 2004Feb 28, 2001Yes
00Mar 17, 2004——
00Jun 4, 2001Feb 28, 2001—
00Mar 20, 2001Jan 22, 2001—
00Dec 16, 2000Oct 20, 2000Yes
00Nov 7, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532740, documented in the API reference.