WELL · 42-215-32903 · DISTRICT 4

McAllen Fieldwide Unit #74

N

Hidalgo County · McAllen (Consolidated FB-B) field  · Directional

Mcallen Fieldwide Unit #74 (API 42-215-32903) is a well in Hidalgo County operated by Totalfinaelf E&P USA Inc, completed November 4, 2001.

The RRC has issued 2 drilling permits (amended twice) between 2001 and 2002, permitted to 13,500 ft.

Completion filings report 5 formation tops, including Card, 8,500, 8500, Hansen.

No lease production has been reported under this well’s leases.

Operator of record

Totalfinaelf E&P USA Inc

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 18, 2002
Permits on file
138
Phone
(713) 647-3559

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTotalfinaelf E&P USA Inc
Production reportsShell Western E&Pthrough Aug 2009
Latest permitTotalfinaelf E&P USA IncMay 22, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
4
permits on file
May 22, 2002
last permit issued
Nov 4, 2001
completed
0
cumulative oil, bbl
4.8M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 4, 2001
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McAllen Fieldwide Unit G-4-190613McAllen-Pharr (Consolidated)Merit Energy Company104.34MMay 2002 – Jul 2026
McAllen Fieldwide Unit G-4-188005McAllen (Consolidated FB-B)Totalfinaelf E&P USA Inc10455KNov 2001 – May 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Totalfinaelf E&P USA IncNov 2001 → Aug 2003
  2. 2Total E&P USA, Inc.Sep 2003 → Jan 2006
  3. 3Shell Western E&PFeb 2006 → Aug 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
520244-99RecompletionTotalfinaelf E&P USA IncMay 22, 2002May 22, 2002Mar 14, 200213,500
509688-97DrillTotalfinaelf E&P USA IncAug 2, 2001May 31, 2001Aug 1, 200113,500
509688-98DrillTotalfinaelf E&P USA IncJun 27, 2001May 31, 2001—13,500
509688-99DrillTotalfinaelf E&P USA IncMay 31, 2001May 31, 2001—13,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-188005————
—— G-4-190613————

Formation tops

As filed on W-2/G-1. Subsea from 400 ft elevation.Download CSV →

FormationMD ftSubsea
Card7,960-7,560
8,5009,200-8,800
85009,200-8,800
Hansen10,410-10,010
Marks11,218-10,818

Perforations

Perforated and open-hole intervals.

FromToType
9,1819,215Perforated
11,45811,468Perforated
11,62511,635Perforated
11,78912,265Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,58517.51,885 S
9.6258,85012.251,745 S
512,3606.5350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 2011Feb 10, 2011—
00Nov 5, 2002Jun 13, 2002Yes
00Sep 27, 2002——
00Aug 22, 2002Jun 12, 2002—
00May 30, 2002Mar 4, 2002Yes
00Apr 12, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532903, documented in the API reference.