WELL · 42-215-32939 · DISTRICT 4

Wheelock Gas Unit O/A #8

Y

Hidalgo County · Jeffress (Vicksburg V) field · Producing  · Vertical

Wheelock Gas Unit O/A #8 (API 42-215-32939) is a well in Hidalgo County operated by Vantage Operating LLC, completed December 30, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 4, 2001, permitted to 14,000 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Vantage Operating LLC on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Vantage Operating LLC

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active – Extension (X)
P-5 last filed
Feb 5, 2026
Permits on file
15
Phone
(210) 298-6370

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVantage Operating LLC
Production reportsVantage Operating, LLCthrough Jul 2024
Latest permitTexaco E & P Inc.Oct 4, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
Oct 4, 2001
last permit issued
Dec 30, 2001
completed
0
cumulative oil, bbl
7.92M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 30, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wheelock Gas Unit O/A G-4-187000Jeffress (Vicksburg V)Vantage Operating, LLC107.92MDec 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 58(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Dec 2001 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Jul 2004
  3. 3XTO Energy Inc.Aug 2004 → Dec 2020
  4. 4Vantage Operating, LLCNov 2021 → Jul 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
514173-99DrillTexaco E & P Inc.Oct 4, 2001Oct 4, 2001Oct 27, 200114,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-187000————

Perforations

Perforated and open-hole intervals.

FromToType
11,30011,418Perforated
11,46411,598Perforated
11,63411,662Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,51017.51,930 S
9.6256,23712.25580 S
3.512,7004.5245 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 26, 2002Feb 8, 2002Yes
00Feb 26, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532939, documented in the API reference.