WELL · 42-215-32987 · DISTRICT 4

Stalker Gas Unit #7

N

Hidalgo County · Monte Christo N. (Vicksburg L) field  · Directional · Sidetrack

Stalker Gas Unit #7 (API 42-215-32987) is a well in Hidalgo County operated by El Paso E & P Company L. P., completed December 4, 2002.

The RRC has issued 2 drilling permits (amended once) between 2002 and 2007, permitted to 20,000 ft.

Completion filings report 2 formation tops, including L, T Lo.

No lease production has been reported under this well’s leases.

Operator of record

EL Paso E & P Company L. P.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
May 8, 2012
Permits on file
582
Phone
(713) 420-7557

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Paso E & P Company L. P.
Production reportsMerit Energy Companythrough Apr 2026
Latest permitEL Paso E & P Company, L. P.Jun 27, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

20,000
total depth, ft
3
permits on file
Jun 27, 2007
last permit issued
Dec 4, 2002
completed
0
cumulative oil, bbl
1.38M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 4, 2002
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stalker Gas Unit G-4-194484Monte Christo, N(vicksburg T LO)Merit Energy Company100Dec 2002 – Jul 2026
Stalker Gas Unit G-4-230651Monte Christo (58,59 Cons.)Merit Energy Company101.24MAug 2007 – Jul 2026
Stalker Gas Unit G-4-194402Monte Christo, N. (Vicksburg L)EL Paso E & P Company, L. P.10135KDec 2002 – Aug 2007

Gas, mcf lease total

Last 12 months 1,897 · prior 12 2,685(-29%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso Production Oil & Gas Co.Dec 2002 → Jul 2006
  2. 2EL Paso E & P Company, L. P.Aug 2006 → Jul 2012
  3. 3EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  4. 4Cantera Operating, LLCNov 2013 → Nov 2017
  5. 5Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
640824-99RecompletionEL Paso E & P Company, L. P.Jun 15, 2007Jun 27, 2007Jul 24, 20079,880
519671-98Drill · sidetrackEL Paso Production Oil & Gas Co.Sep 18, 2002May 3, 2002Jun 29, 200220,000
519671-99DrillEL Paso Production Oil & Gas Co.May 3, 2002May 3, 2002—20,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-194402————
—— G-4-194484————
—— G-4-230651————

Formation tops

As filed on W-2/G-1. Subsea from 195 ft elevation.Download CSV →

FormationMD ftSubsea
L13,700-13,505
T LO17,096-16,901

Perforations

Perforated and open-hole intervals.

FromToType
9,5569,590Perforated
17,09617,103Perforated
17,11017,129Perforated
17,16217,174Perforated
17,19217,194Perforated
17,20617,212Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,00017.52,350 S
9.62510,20712.251,075 S
518,2406.5865 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 13, 2007Sep 21, 2007Yes
00Nov 7, 2007——
00Jun 4, 2003Apr 1, 2003Yes
00May 29, 2003——
00May 23, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21532987, documented in the API reference.