WELL · 42-215-33084 · DISTRICT 4
McNear #1
Hidalgo County · Shepherd (L-2) field · Vertical
Mcnear #1 (API 42-215-33084) is a plugged well in Hidalgo County, plugged June 2, 2004, last operated by Square Mile Energy L.L.C..
The RRC has issued one drilling permit (amended once), issued February 13, 2003, permitted to 9,800 ft.
It was permitted by Tri-C Resources, Inc. and has since transferred to Square Mile Energy L.L.C. on the wellbore schedule.
Completion filings report one formation top, including Frio.
Operator of record
Permitted by Tri-C Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 1, 2025
- Permits on file
- 177
- Phone
- (713) 266-3685
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Square Mile Energy L.L.C. |
| Production reports | Square Mile Energy, L.L.C.through Feb 2004 |
| Latest permit | Tri-C Resources, Inc.Feb 13, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,800
- total depth, ft
- 2
- permits on file
- Feb 13, 2003
- last permit issued
- Apr 2, 2003
- completed
- 0
- cumulative oil, bbl
- 117K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2003 THROUGH Jun 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 2, 2003
- Shut in
- —
- Plugged
- Jun 2, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McNear G-4-194659 | Shepherd (L-2) | Square Mile Energy, L.L.C. | 1 | 0 | 117K | Apr 2003 – Jun 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tri-C Resources, Inc.Apr 2003 → Jul 2003
- 2Square Mile Energy, L.L.C.Aug 2003 → Feb 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 528410-98 | Drill | Tri-C Resources, Inc. | May 7, 2003 | Feb 13, 2003 | Feb 20, 2003 | 9,800 |
| 528410-99 | Drill | Tri-C Resources, Inc. | Feb 12, 2003 | Feb 13, 2003 | — | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-194659 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 84 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,997 | 9,000 | Perforated |
| 9,011 | 9,016 | Perforated |
| 9,034 | 9,039 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,998 | 14.75 | 1,214 S |
| 7.625 | 8,589 | 9.875 | 528 S |
| 4.5 | 9,250 | 6.75 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 12, 2003 | May 9, 2003 | Yes |
| 00 | Jun 4, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-33084 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-33084 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21533084, documented in the API reference.