WELL · 42-215-33097 · DISTRICT 4

Edinburg Unit #5

Plugged

Hidalgo County · Edinburg S. (Marks 11030) field  · Directional

Edinburg Unit #5 (API 42-215-33097) is a plugged well in Hidalgo County, plugged September 27, 2019, last operated by Royal Production Company Inc..

The RRC has issued 3 drilling permits (amended once) between 2003 and 2014, permitted to 12,500 ft.

Completion filings report 4 formation tops, including 9000, Tex Miss, Hansen, U. Marks.

Operator of record

Royal Production Company Inc.

Based in
Corpus Christ, TX
P-5 status
Active (A)
P-5 last filed
Jan 29, 2026
Permits on file
235
Phone
(361) 888-4792

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRoyal Production Company Inc.
Production reportsRoyal Production Company, Inc.through Aug 2018
Latest permitRoyal Production Company, Inc.Nov 25, 2014
12,500
total depth, ft
4
permits on file
Nov 25, 2014
last permit issued
Feb 17, 2005
completed
0
cumulative oil, bbl
19.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2003 THROUGH Sep 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 17, 2005
Shut in
—
Plugged
Sep 27, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Edinburg Unit G-4-209339Edinburg ( 9,000)Royal Production Company, Inc.1010.5MFeb 2005 – Sep 2019
Edinburg Unit G-4-277201Edinburg (10,760)Royal Production Company, Inc.10526KNov 2014 – Sep 2019
Edinburg Unit G-4-199312Edinburg, S. (Marks 11030)Royal Production Company, Inc.108.05MNov 2003 – Nov 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Royal Production Company, Inc.Nov 2003 → Aug 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
800296-99RecompletionRoyal Production Company, Inc.Nov 14, 2014Nov 25, 2014Aug 5, 201412,461
602317-99RecompletionRoyal Production Company, Inc.Jun 20, 2005Jun 22, 2005Feb 14, 200512,500
530147-98DrillRoyal Production Company, Inc.May 19, 2003Mar 31, 2003Aug 25, 200312,500
530147-99DrillRoyal Production Company, Inc.Mar 31, 2003Mar 31, 2003—12,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-199312————
—— G-4-209339————
—— G-4-277201————

Formation tops

As filed on W-2/G-1. Subsea from 105 ft elevation.Download CSV →

FormationMD ftSubsea
90008,952-8,847
Tex Miss9,430-9,325
Hansen10,222-10,117
Hansen10,700-10,595
U. Marks11,162-11,057
U. Marks11,640-11,535

Perforations

Perforated and open-hole intervals.

FromToType
9,4329,444Perforated
10,75010,766Perforated
10,82710,834Perforated
10,87010,886Perforated
10,93210,941Perforated
10,94810,964Perforated
11,00811,012Perforated
11,64011,704Perforated
11,64011,924Perforated
11,76011,879Perforated
11,89811,924Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,06414.751,150 S
7.6259,3709.875775 S
4.512,0166.75485 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 13, 2015Dec 11, 2014—
00Sep 15, 2005Mar 17, 2005Yes
00Jul 13, 2005——
00Mar 22, 2004Jan 9, 2004Yes
00Feb 26, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21533097, documented in the API reference.