WELL · 42-215-33220 · DISTRICT 4

Garcia F #6

Plugged

Hidalgo County · Samano (Third Massive) field  · Vertical

Garcia F #6 (API 42-215-33220) is a plugged well in Hidalgo County, plugged December 3, 2012, last operated by Legend Natural Gas IV LP.

The RRC has issued 3 drilling permits between 2004 and 2007, permitted to 11,000 ft.

It was permitted by El Paso E & P Company, L. P. and has since transferred to Legend Natural Gas IV LP on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Legend Natural Gas IV LP

Permitted by EL Paso E & P Company, L. P.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 11, 2015
Permits on file
136
Phone
(281) 644-5900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLegend Natural Gas IV LP
Production reportsLegend Natural Gas IV, LPthrough Feb 2012
Latest permitEL Paso E & P Company, L. P.Aug 22, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
3
permits on file
Aug 22, 2007
last permit issued
Jun 30, 2004
completed
0
cumulative oil, bbl
346K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2004 THROUGH Aug 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 30, 2004
Shut in
—
Plugged
Dec 3, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garcia "F" G-4-232283Samano (1ST Massive)Trinity River Energy Oper, LLC10173KJul 2007 – Aug 2015
Garcia "F" G-4-226915Samano (Third Massive)Legend Natural Gas IV, LP10169KJul 2004 – Dec 2012
Garcia "F" G-4-204085Samano (Fourth Massive)EL Paso Production Company104.39KJun 2004 – Feb 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EL Paso E & P Company, L. P.Jul 2004 → Jul 2008
  2. 2EL Paso Production CompanyJun 2005 → Jun 2005
  3. 3Smith Production Inc.Aug 2008 → Mar 2011
  4. 4Legend Natural Gas IV, LPApr 2011 → Feb 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
644707-99RecompletionEL Paso E & P Company, L. P.Aug 20, 2007Aug 22, 2007Jul 2, 20079,370
636752-99RecompletionEL Paso E & P Company, L. P.Apr 10, 2007May 24, 2007Jun 7, 20049,370
546480-99DrillThorp Petroleum CorporationJun 3, 2004Jun 3, 2004—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-204085————
—— G-4-226915————
—— G-4-232283————

Formation tops

As filed on W-2/G-1. Subsea from 319 ft elevation.Download CSV →

FormationMD ftSubsea
Frio3,569-3,250

Perforations

Perforated and open-hole intervals.

FromToType
7,3927,428Perforated
7,5367,550Perforated
9,0889,178Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,51514.75850 S
7.6256,8459.875695 S
4.59,6006.75405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 30, 2008Aug 8, 2007Yes
00Jan 16, 2008——
00Jul 18, 2007May 25, 2007Yes
00Jul 3, 2007Jun 18, 2007—
00Jun 4, 2007——
00Jan 5, 2005Oct 4, 2004Yes
00Nov 10, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21533220, documented in the API reference.