TEXAS · WELLS · HIDALGO COUNTY · WEST, TEMPLE W. LEASE · API 42-215-33424 · DISTRICT 04
West Temple W. #47
Hidalgo County · Tabasco (Consolidated) field · Producing · Vertical
- Fields on the latest permit · any of 2
- Tabasco (N) · Tabasco (P)
- Not one formation; the well must be completed in one of them, and no target formation is stated.
West Temple W. #47 (API 42-215-33424) is a well in Hidalgo County operated by Hilcorp Energy Company, completed May 28, 2006 and listed as producing on the RRC schedule, shut in May 1, 2026.
The RRC has issued one drilling permit, issued January 13, 2006, permitted to 7,261 ft.
It was permitted by Fidelity Explor. & Prod. CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, Heard Sand, Mission Sand.
Its lease has reported 4.6K barrels of oil and 633K mcf of gas since May 2006, last reporting volume in April 2026.
Operator of record
Permitted by Fidelity Explor. & Prod. Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Fidelity Explor. & Prod. Co.Jan 13, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,261
- total depth, ft
- 1
- permits on file
- Jan 13, 2006
- last permit issued
- May 28, 2006
- completed
- 4.6K
- cumulative oil, bbl
- 633K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · MAY 2006 THROUGH APR 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 28, 2006
- Shut in
- May 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| West, Temple W. G-4-221575 | Tabasco (Consolidated) | Hilcorp Energy Company | 1 | 4.6K | 633K | May 2006 – Apr 2026 |
Gas, mcf lease total
Last 12 months 2,887 · prior 12 7,085(-59%)
Wells named West Temple W.
Hilcorp Energy Company's other wells filed under this lease name in Hidalgo County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Fidelity Explor. & Prod. Co.May 2006 → Sep 2014
- 2Hilcorp Energy CompanyOct 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 612332-99 | Drill | Fidelity Explor. & Prod. Co. | Jan 12, 2006 | Jan 13, 2006 | Apr 6, 2006 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 28, 2006 | West Temple W. G-4-221575 | Tabasco (Consolidated) | Hilcorp Energy Company | Producing · shut in May 1, 2026 | 7,261 |
Formation tops
As filed on W-2/G-1. Subsea from 26 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| FrioTOP FRIO | 4,400 | -4,374 |
| Heard Sand | 5,984 | -5,958 |
| Mission Sand | 6,677 | -6,651 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,988 | 6,000 | Perforated |
| 6,000 | 6,030 | Perforated |
| 6,030 | 6,060 | Perforated |
| 6,602 | 6,660 | Perforated |
| 6,668 | 6,670 | Perforated |
| 6,676 | 6,700 | Perforated |
| 6,709 | 6,725 | Perforated |
| 6,830 | 6,836 | Perforated |
| 6,866 | 6,868 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,637 | 12.25 | 640 S |
| 7 | 7,258 | 8.75 | 496 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 8, 2007 | Sep 17, 2007 | — |
| 00 | Jun 1, 2007 | May 21, 2007 | — |
| 00 | Mar 7, 2007 | Aug 17, 2006 | Yes |
| 00 | Nov 16, 2006 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received May 1, 2009. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Frio, Heard Sand, Mission Sand | TIFF | 3,950 to 7,260 | May 1, 2009run Apr 20, 2006 | 3.70 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-215-33424 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-215-33424 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21533424, documented in the API reference.