TEXAS · WELLS · HIDALGO COUNTY · WEST, TEMPLE W. LEASE · API 42-215-33638 · DISTRICT 04

West Temple W. #57

Y

Hidalgo County · Tabasco (Consolidated) field · Producing  · Vertical

West Temple W. #57 (API 42-215-33638) is a well in Hidalgo County operated by Hilcorp Energy Company, completed March 21, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 27, 2007, permitted to 8,437 ft.

It was permitted by Fidelity Explor. & Prod. CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Mission, Heard.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Fidelity Explor. & Prod. Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitFidelity Explor. & Prod. Co.Apr 27, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,437
total depth, ft
1
permits on file
Apr 27, 2007
last permit issued
Mar 21, 2011
completed
0
cumulative oil, bbl
1.22M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 21, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West, Temple W. G-4-242175Tabasco (Consolidated)Hilcorp Energy Company101.22MJun 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 2,877 · prior 12 2,526(+14%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fidelity Explor. & Prod. Co.Jun 2008 → Sep 2014
  2. 2Hilcorp Energy CompanyOct 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
637445-99DrillFidelity Explor. & Prod. Co.Apr 19, 2007Apr 27, 2007May 29, 20088,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 21, 2011West Temple W. G-4-242175Tabasco (Consolidated)Hilcorp Energy CompanyProducing8,437

Formation tops

As filed on W-2/G-1. Subsea from 170 ft elevation.Download CSV →

FormationMD ftSubsea
Mission5,710-5,540
Heard6,050-5,880

Perforations

Perforated and open-hole intervals.

FromToType
6,4026,431Perforated
6,6456,667Perforated
6,6456,769Perforated
6,7286,769Perforated
6,8646,896Perforated
6,9406,962Perforated
7,0927,102Perforated
7,3147,351Perforated
7,4067,532Perforated
7,7007,798Perforated
7,9878,007Perforated
8,1548,164Perforated
8,1968,206Perforated
8,1968,216Perforated
8,2708,285Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.8751,61612.25549 S
78,4378.75374 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 28, 2011Mar 30, 2011—
00Aug 24, 2009Jul 10, 2009—
00Dec 10, 2008Aug 8, 2008Yes
00Nov 19, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21533638, documented in the API reference.