WELL · 42-219-01559 · DISTRICT 8

Murrell #1-SWD

N

Hockley County · Smyer field  · Vertical

Murrell #1-SWD (API 42-219-01559) is a well in Hockley County operated by Texland-Rector & Schumacher, completed March 14, 1986.

The RRC has issued one drilling permit, issued November 15, 1982, permitted to 1,970 ft.

Completion filings report 3 formation tops, including Santa Rosa, Anhydrite, Lime.

Its lease has reported 1.57M barrels of oil and 111K mcf of gas since January 1993, last reporting in July 2026. The lease carries 36 wells, so these are lease totals, not this well alone.

Operator of record

Texland-Rector & Schumacher

Based in
Fort Worth, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 14, 2000
Permits on file
836
Phone
(817) 336-2751

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexland-Rector & Schumacher
Production reportsTexland Petroleum, L.P.through Apr 2026
Latest permitTexland-Rector & SchumacherNov 15, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,970
total depth, ft
1
permits on file
Nov 15, 1982
last permit issued
Mar 14, 1986
completed
1.57M
cumulative oil, bbl
111K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 14, 1986
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 36 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smyer NE Unit O-11-65777SmyerTexland Petroleum, L.P.361.57M111KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 29,028 · prior 12 32,420(-10%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 5,059 · prior 12 4,760(+6%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texland-Rector & SchumacherJan 1993 → Nov 2000
  2. 2Texland Petroleum Inc.Dec 2000 → Mar 2003
  3. 3Texland Petroleum, L.P.Apr 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
177269-99OtherTexland-Rector & SchumacherNov 15, 1982Nov 15, 1982—1,970

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-65777————

Formation tops

As filed on W-2/G-1. Subsea from 3,382 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa1,5301,852
Anhydrite1,9721,410
Lime4,196-814

Perforations

Perforated and open-hole intervals.

FromToType
1,5331,580Perforated
5,7925,946Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,492——
8.6251,98312.251,000 S
5.56,1027.8751,400 S
5.56,1357.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 23, 1998Jan 15, 1997—
00May 7, 1986Apr 16, 1986—
00May 1, 1986——
00Jan 12, 1984Apr 1, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.42M
bbl, all reported
Mar 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000046838H-1 InjectionCanceled Feb 29, 20005002,0005,790–6,130

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21901559, documented in the API reference.