WELL · 42-219-34237 · DISTRICT 8

Stanley Jack L. #1

N

Hockley County · Levelland (San Andres) field  · Vertical

Stanley Jack L. #1 (API 42-219-34237) is a well in Hockley County operated by Bryant Oil, completed May 20, 1984.

The RRC has issued one drilling permit, issued February 14, 1984, permitted to 4,900 ft.

Completion filings report 3 formation tops, including Rustler, Yates, San Andres.

Its lease has reported 546 barrels of oil and 1.24K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Bryant Oil

Levelland, TX · P-5 Y, filed Nov 4, 2025 · 22 permits on file · (806) 638-4723

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBryant Oil
Production reportsBryant Oilthrough Dec 1998
Latest permitBryant OilFeb 14, 1984
4,900
total depth, ft
1
permits on file
Feb 14, 1984
last permit issued
May 20, 1984
completed
546
cumulative oil, bbl
1.24K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stanley, Jack L. O-11-65125LevellandBryant Oil15461.24KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bryant OilJan 1993 → Dec 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
229466-99DrillBryant OilFeb 13, 1984Feb 14, 1984Apr 15, 19844,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-65125————

Formation tops

As filed on W-2/G-1. Subsea from 3,633 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,0411,592
Yates2,5101,123
Yates2,5401,093
San Andres3,760-127
San AndresSAN ANDRES PAY4,690-1,057

Perforations

Perforated and open-hole intervals.

FromToType
4,6944,744Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62544012.25300 sx
4.54,7527.8751,300 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 1985Dec 12, 1984—
00Feb 23, 1985——
00Jul 10, 1984Jun 7, 1984—
00Jun 30, 1984Jun 7, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21934237, documented in the API reference.