WELL · 42-219-35976 · DISTRICT 8

Bailey #2

Y

Hockley County · Linker (Clear Fork) field · Producing  · Vertical

Bailey #2 (API 42-219-35976) is a well in Hockley County operated by Bullin R. E. Operating Inc., completed June 30, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 11, 1993, permitted to 8,400 ft.

It was permitted by Wheeler Operating Corporation and has since transferred to Bullin R. E. Operating Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including San Andres, Glorieta, Clear Fork.

Its lease has reported 82.8K barrels of oil and 18.5K mcf of gas since May 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Bullin R. E. Operating Inc.

Permitted by Wheeler Operating Corporation; the EWA schedule now lists a different operator.

Levelland, TX · P-5 Y, filed Oct 4, 2025 · 5 permits on file · (719) 494-6709

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBullin R. E. Operating Inc.
Production reportsBullin, R. E. Operating Inc.through Apr 2026
Latest permitWheeler Operating CorporationMay 11, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,400
total depth, ft
1
permits on file
May 11, 1993
last permit issued
Jun 30, 1993
completed
82.8K
cumulative oil, bbl
18.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 30, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bailey O-11-67102Linker (Clear Fork)Bullin, R. E. Operating Inc.382.8K18.5KMay 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 457 · prior 12 518(-12%)

0100200202420252026

Gas, mcf lease total

Last 12 months 360 · prior 12 360(+0%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wheeler Operating CorporationMay 1993 → Jun 1995
  2. 2Bullin, R. E. Operating Inc.Jul 1995 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
411474-99DrillWheeler Operating CorporationMay 7, 1993May 11, 1993May 26, 19938,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67102————

Formation tops

As filed on W-2/G-1. Subsea from 3,503 ft elevation.Download CSV →

FormationMD ftSubsea
San AndresSAN ANDRES POROSITY4,908-1,405
Glorieta5,423-1,920
Clear ForkUPPER CLEARFORK6,262-2,759
Clear ForkLOWER CLEARFORK6,812-3,309

Perforations

Perforated and open-hole intervals.

FromToType
7,4987,648Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62543612.25250 S
5.57,3007.8752,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 1993Jul 16, 1993Yes
00Jul 20, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21935976, documented in the API reference.