WELL · 42-219-36643 · DISTRICT 8

Slaughter Consolidated #323

Y

Hockley County · Tstar (Abo) field · Injection  · Horizontal

Slaughter Consolidated #323 (API 42-219-36643) is a horizontal well in Hockley County operated by Hilcorp Energy Company, completed July 21, 2025 and listed as injection on the RRC schedule.

The RRC has issued 2 drilling permits between 2002 and 2007, permitted to 8,300 ft.

It was permitted by Occidental Permian Ltd. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 7 formation tops, including Yates, Seven Rivers, Queen, Tubb.

Its lease has reported 19M barrels of oil and 17M mcf of gas since January 1999, last reporting in July 2026. The lease carries 106 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 3.84K barrels injected in the 12 months reported through March 2026.

Operator of record

Hilcorp Energy Company

Permitted by Occidental Permian Ltd.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitOccidental Permian Ltd.Feb 10, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,300
total depth, ft
2
permits on file
Feb 10, 2007
last permit issued
Jul 21, 2025
completed
19M
cumulative oil, bbl
17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 21, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 106 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slaughter Consolidated O-11-68016Tstar (Abo)Hilcorp Energy Company10619M17MJan 1999 – Jul 2026

Oil, barrels lease total

Last 12 months 346,211 · prior 12 399,029(-13%)

020K40K60K202420252026

Gas, mcf lease total

Last 12 months 1,437,396 · prior 12 269,365(+434%)

0200K400K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Altura Energy Ltd.Jan 1999 → Apr 2000
  2. 2Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
633234-99RecompletionOccidental Permian Ltd.Feb 8, 2007Feb 10, 2007Apr 19, 20078,300
518458-99DrillOccidental Permian Ltd.Mar 21, 2002Mar 22, 2002Apr 15, 20028,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68016————

Formation tops

As filed on W-2/G-1. Subsea from 3,508 ft elevation.Download CSV →

FormationMD ftSubsea
Yates2,863645
Seven Rivers3,079429
Queen3,650-142
Tubb3,930-422
Clear ForkLOWER CLEARFORK4,118-610
Clear ForkLOWER CLEARFORK5,587-2,079
Tubb6,827-3,319
Clear ForkLOWER CLEARFORK7,060-3,552
Wichita-AlbanyWICHITA ALBANY7,330-3,822
Whichita Albany7,331-3,823
Clear ForkLOWER CLEARFORK——
Tubb——
Wichita-AlbanyWICHITA ALBANY——

Perforations

Perforated and open-hole intervals.

FromToType
7,4117,730Open hole
7,41110,066Perforated
7,41110,066Open hole
7,6037,879Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,25912.25820 S
5.58,1067.8752,800 S
5.5—7.8752,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 13, 2025Sep 10, 2025—
00Dec 16, 2024Dec 9, 2024—
00Dec 9, 2024Jul 2, 2024—
00May 31, 2011Dec 22, 2010—
00Jan 15, 2008Aug 16, 2007Yes
00Oct 10, 2002Jul 11, 2002Yes
00Sep 4, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.84K
bbl, last 12 reported months
124K
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092204H-1 InjectionActive5,0003,5007,100–8,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,841 · prior 12 3,207(+20%)

02K4K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21936643, documented in the API reference.