TEXAS · WELLS · HOOD COUNTY · WILHOIT LEASE · API 42-221-31014 · DISTRICT 7C
Wilhoit #3H
Hood County · Newark East (Barnett Shale) field · Horizontal
Wilhoit #3H (API 42-221-31014) is a plugged horizontal well in Hood County, plugged May 9, 2012, last operated by Xto Energy Inc..
The RRC has issued one drilling permit, issued May 20, 2005, permitted to 10,000 ft.
Completion filings report 3 formation tops, including Big Saline, Marble Falls, Barnett.
Its lease has reported 123 barrels of oil and 44.4K mcf of gas since July 2005, with no volume in the three years through April 2026.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Feb 2009 |
| Latest permit | XTO Energy Inc.May 20, 2005 |
- 10,000
- total depth, ft
- 1
- permits on file
- May 20, 2005
- last permit issued
- Apr 7, 2007
- completed
- 123
- cumulative oil, bbl
- 44.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Feb 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 7, 2007
- Shut in
- —
- Plugged
- May 9, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wilhoit G-13-217248 | Newark, East (Barnett Shale) | XTO Energy Inc. | 1 | 123 | 44.4K | Jul 2005 – Feb 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1XTO Energy Inc.Apr 2007 → Feb 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600954-99 | Drill | XTO Energy Inc. | May 19, 2005 | May 20, 2005 | Jun 14, 2005 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 7, 2007 | Wilhoit G-13-217248 | Newark East (Barnett Shale) | XTO Energy Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 819 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Big Saline | 4,575 | -3,756 |
| Marble Falls | 4,675 | -3,856 |
| Marble Falls | 4,703 | -3,884 |
| BarnettBARNETT SHALE | 5,025 | -4,206 |
| BarnettUPPER BARNETT | 5,262 | -4,443 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,119 | 8,764 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 360 | 12.25 | 225 S |
| 5.5 | 8,841 | 8.75 | 1,070 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 30, 2007 | Mar 24, 2007 | — |
| 00 | Nov 20, 2006 | Jun 7, 2006 | Yes |
| 00 | Jul 24, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-221-31014 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-221-31014 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22131014, documented in the API reference.