TEXAS · WELLS · HOOD COUNTY · MILLS LEASE · API 42-221-31016 · DISTRICT 7C

Mills #2H

Y

Hood County · Newark East (Barnett Shale) field · Producing  · Horizontal

Mills #2H (API 42-221-31016) is a horizontal well in Hood County operated by Bkv Barnett II LLC, completed August 15, 2005 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 24, 2005, permitted to 5,710 ft.

It was permitted by Encana Oil & Gas(USA) Inc. and has since transferred to Bkv Barnett II LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Marble Falls, Barnett.

Its lease has reported 3.26K barrels of oil and 907K mcf of gas since August 2005, last reporting volume in April 2026.

Operator of record

BKV Barnett II LLC

Permitted by Encana Oil & Gas(usa) Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 2, 2025
Permits on file
5
Phone
(940) 394-2000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBKV Barnett II LLC
Production reportsBKV Barnett II, LLCthrough Apr 2026
Latest permitEncana Oil & Gas(usa) Inc.May 24, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,710
total depth, ft
1
permits on file
May 24, 2005
last permit issued
Aug 15, 2005
completed
3.26K
cumulative oil, bbl
907K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 15, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Mills G-13-213746Newark, East (Barnett Shale)BKV Barnett II, LLC13.26K907KAug 2005 – Apr 2026

Gas, mcf lease total

Last 12 months 13,312 · prior 12 16,220(-18%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encana Oil & Gas(usa) Inc.Sep 2005 → Dec 2011
  2. 2Enervest Operating, L.L.C.Jan 2012 → Jan 2019
  3. 3Bedrock Production, LLCFeb 2019 → Aug 2025
  4. 4BKV Barnett II, LLCSep 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
601049-99DrillEncana Oil & Gas(usa) Inc.May 23, 2005May 24, 2005May 27, 20059,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 15, 2005Mills G-13-213746Newark East (Barnett Shale)BKV Barnett II LLCProducing5,710

Formation tops

As filed on W-2/G-1. Subsea from 789 ft elevation.Download CSV →

FormationMD ftSubsea
Marble Falls5,185-4,396
BarnettBARNETT SHALE5,759-4,970

Perforations

Perforated and open-hole intervals.

FromToType
6,2506,350Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62545312.25290 S
5.58,3457.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 12, 2006Nov 1, 2005Yes
00Feb 8, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22131016, documented in the API reference.