TEXAS · WELLS · HOOD COUNTY · HINTON LEASE · API 42-221-31237 · DISTRICT 7C

Hinton #3H

Shut in

Hood County · Newark East (Barnett Shale) field · Temp Abandoned  · Horizontal

Hinton #3H (API 42-221-31237) is a horizontal well in Hood County operated by Eagleridge Operating LLC, completed February 19, 2007 and listed as temp abandoned on the RRC schedule, shut in December 1, 2008.

The RRC has issued one drilling permit, issued December 1, 2006, permitted to 6,208 ft.

It was permitted by Quicksilver Resources Inc. and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Grant, Hood, Marble Falls, Barnett.

Its lease has reported 66 barrels of oil and 74.9K mcf of gas since February 2007, with no volume in the three years through April 2026.

Operator of record

Eagleridge Operating LLC

Permitted by Quicksilver Resources Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
129
Phone
(214) 295-6704

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsDiversified Production LLCthrough Jun 2009
Latest permitQuicksilver Resources Inc.Dec 1, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,208
total depth, ft
1
permits on file
Dec 1, 2006
last permit issued
Feb 19, 2007
completed
66
cumulative oil, bbl
74.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Jun 2009

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 19, 2007
Shut in
Dec 1, 2008
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hinton G-13-236307Newark, East (Barnett Shale)Diversified Production LLC16674.9KFeb 2007 – Jun 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quicksilver Resources Inc.May 2007 → Jun 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
629867-99DrillQuicksilver Resources Inc.Dec 1, 2006Dec 1, 2006Dec 14, 20066,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 19, 2007Hinton G-13-236307Newark East (Barnett Shale)Eagleridge Operating LLCTemp Abandoned · shut in Dec 1, 20086,208

Formation tops

As filed on W-2/G-1. Subsea from 942 ft elevation.Download CSV →

FormationMD ftSubsea
Grant4,909-3,967
Hood5,579-4,637
Marble Falls5,806-4,864
BarnettBARNETT SHALE6,540-5,598

Perforations

Perforated and open-hole intervals.

FromToType
6,8428,980Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,06912.25450 S
5.59,0608.75842 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 25, 2008Dec 4, 2007Yes
00Jul 3, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22131237, documented in the API reference.