TEXAS · WELLS · HOOD COUNTY · BUTLER UNIT LEASE · API 42-221-31812 · DISTRICT 7C

Butler Unit #1H

Plugged

Hood County · Newark East (Barnett Shale) field  · Horizontal

Butler Unit #1H (API 42-221-31812) is a plugged horizontal well in Hood County, plugged January 9, 2020, last operated by Eagleridge Operating LLC.

The RRC has issued one drilling permit (amended once), issued March 23, 2009, permitted to 9,000 ft.

It was permitted by Range Production Company and has since transferred to Eagleridge Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Base Cretaceous (marker), Atoka, Barnett.

Operator of record

Eagleridge Operating LLC

Permitted by Range Production Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
129
Phone
(214) 295-6704

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEagleridge Operating LLC
Production reportsEagleridge Operating, LLCthrough Aug 2017
Latest permitRange Production CompanyMay 20, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
May 20, 2009
last permit issued
Aug 14, 2009
completed
0
cumulative oil, bbl
627K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 14, 2009
Shut in
—
Plugged
Jan 9, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Butler Unit G-13-253732Newark, East (Barnett Shale)Eagleridge Operating, LLC10627KAug 2009 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Range Production CompanyAug 2009 → Sep 2012
  2. 2Legend Natural Gas IV, LPOct 2012 → Feb 2015
  3. 3Trinity River Energy Oper, LLCMar 2015 → Sep 2016
  4. 4Eagleridge Operating, LLCAug 2017 → Aug 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
679671-98DrillRange Production CompanyMay 18, 2009May 20, 2009—9,000
679671-99DrillRange Production CompanyMar 19, 2009Mar 23, 2009—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 14, 2009Butler Unit G-13-253732Newark East (Barnett Shale)Eagleridge Operating LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 789 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE CRETACEOUS175614
Base Cretaceous (marker)BASE CRETACEOUS324465
AtokaMID-ATOKA5,457-4,668
BarnettBARNETT SHALE5,719-4,930

Perforations

Perforated and open-hole intervals.

FromToType
6,2536,514Perforated
6,5656,826Perforated
6,8777,138Perforated
7,1897,450Perforated
7,5017,762Perforated
7,8138,074Perforated
8,1258,386Perforated
8,4378,698Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
73949.87543 S
4.59,0736.125409 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 16, 2011Feb 10, 2011—
00Feb 26, 2010Oct 2, 2009Yes
00Dec 31, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22131812, documented in the API reference.