TEXAS · WELLS · HOUSTON COUNTY · LANGHAM LEASE · API 42-225-30891 · DISTRICT 06
Langham #1
Houston County · Percilla field · Vertical
Langham #1 (API 42-225-30891) is a plugged well in Houston County, plugged September 17, 1996, last operated by Harleton Oil & Gas Inc..
The RRC has issued one drilling permit (amended once), issued May 26, 1994, permitted to 6,200 ft.
Completion filings report 3 formation tops, including T/Pecan Gap, T/Austin Chalk, B/A.
Its lease has reported 1.02K barrels of oil and 478 mcf of gas since August 1994, with no volume in the three years through April 2026.
Operator of record
- Based in
- Tyler, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 14, 2025
- Permits on file
- 162
- Phone
- (903) 531-0033
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Harleton Oil & Gas Inc. |
| Production reports | Harleton Oil & Gas Inc.through Jul 1995 |
| Latest permit | Harleton Oil & Gas Inc.May 26, 1994 |
- 6,200
- total depth, ft
- 2
- permits on file
- May 26, 1994
- last permit issued
- Jul 30, 1994
- completed
- 1.02K
- cumulative oil, bbl
- 478
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Jul 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 30, 1994
- Shut in
- —
- Plugged
- Sep 17, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Langham O-6-13349 | Percilla | Harleton Oil & Gas Inc. | 1 | 1.02K | 478 | Aug 1994 – Jul 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Harleton Oil & Gas Inc.Aug 1994 → Jul 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 424139-98 | Drill | Harleton Oil & Gas Inc. | Oct 11, 1994 | May 26, 1994 | — | 6,200 |
| 424139-99 | Drill | Harleton Oil & Gas Inc. | May 23, 1994 | May 26, 1994 | Jun 17, 1994 | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 30, 1994 | Langham O-6-13349 | Percilla | Harleton Oil & Gas Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 426 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Pecan Gap | 4,612 | -4,186 |
| T/Austin Chalk | 5,550 | -5,124 |
| B/A | 5,855 | -5,429 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,923 | 5,929 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,021 | 11 | 281 S |
| 4.5 | 6,171 | 7.875 | 1,175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 1995 | Sep 8, 1994 | Yes |
| 00 | Jan 3, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-225-30891 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-225-30891 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22530891, documented in the API reference.