TEXAS · WELLS · HOWARD COUNTY · API 42-227-02999 · DISTRICT 7B
Clanton Clyde #1
Howard County · Vealmoor (Cisco) field · Vertical
Clanton Clyde #1 (API 42-227-02999) is a plugged well in Howard County, plugged June 8, 1984, last operated by Texaco E & P Inc..
The RRC has issued one drilling permit, issued June 13, 1979, permitted to 7,900 ft.
It was permitted by Texaco Inc. and has since transferred to Texaco E & P Inc. on the wellbore schedule.
Operator of record
Permitted by Texaco Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 22, 2003
- Permits on file
- 3,332
- Phone
- (281) 561-3713
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texaco E & P Inc. |
| Production reports | none |
| Latest permit | Texaco Inc.Jun 13, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,900
- total depth, ft
- 1
- permits on file
- Jun 13, 1979
- last permit issued
- Aug 2, 1979
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 2, 1979
- Shut in
- —
- Plugged
- Jun 8, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 50611-99 | Recompletion | Texaco Inc. | Jun 13, 1979 | Jun 13, 1979 | — | 7,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 2, 1979 | Clanton Clyde O-10-25603 | Vealmoor (Cisco) | Texaco E & P Inc. | Plugged | — |
| — | Clanton Clyde O-10-7083 | Vealmoor | Platinum Exploration Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,484 | 7,576 | Perforated |
| — | 7,971 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 424 | 13.75 | 275 S |
| 7.625 | 3,205 | 9.875 | 500 S |
| 2.375 | 7,479 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 12, 1979 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-02999 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-02999 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22702999, documented in the API reference.