WELL · 42-227-32250 · DISTRICT 8

Otis John #2

Y

Howard County · Howard Glasscock (Consolidated) field · Producing  · Vertical

Otis John #2 (API 42-227-32250) is a well in Howard County operated by R2q Operating LLC, completed October 22, 1980 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 11, 1980, permitted to 2,500 ft.

It was permitted by Guthrie, A. K. Operating CO. and has since transferred to R2q Operating LLC on the wellbore schedule.

Its 2 leases have reported 57.9K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

R2Q Operating LLC

Permitted by Guthrie, A. K. Operating Co.; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLegacy Reserves Operating LP
Production reportsExtex Operating Companythrough Apr 2026
Latest permitGuthrie, A. K. Operating Co.Sep 11, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,500
total depth, ft
1
permits on file
Sep 11, 1980
last permit issued
Oct 22, 1980
completed
57.9K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 22, 1980
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Otis, John O-10-41669Howard Glasscock (Consolidated)Extex Operating Company423.5K0Dec 2011 – Jul 2026
Otis, John O-10-25639Howard GlasscockLegacy Reserves Operating LP434.4K21Jan 1993 – Aug 2012

Oil, barrels lease total

Last 12 months 2,342 · prior 12 2,324(+1%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Guthrie, A. K. Operating Co.Jan 1993 → Mar 1996
  2. 2Marathon Oil CompanyApr 1996 → Oct 1999
  3. 3Brothers Production Company Inc.Nov 1999 → Mar 2006
  4. 4Legacy Reserves Operating LPApr 2006 → Jan 2021
  5. 5Extex Operating CompanyFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
92225-99DrillGuthrie, A. K. Operating Co.Sep 11, 1980Sep 11, 1980—2,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 22, 1980Otis John O-10-41669Howard Glasscock (Consolidated)R2Q Operating LLCProducing2,500
Oct 22, 1980Otis John O-10-25639Howard GlasscockLegacy Reserves Operating LPNot on Schedule—

Perforations

Perforated and open-hole intervals.

FromToType
2,1872,401Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3752,334——
5.52,5007.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 1, 2012Oct 28, 1980—
00Jan 12, 1984Oct 28, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22732250, documented in the API reference.