WELL · 42-227-32758 · DISTRICT 8

Guitar Earl Jr. -C- #8

N

Howard County · Moore field  · Vertical

Guitar Earl JR. -C- #8 (API 42-227-32758) is a well in Howard County operated by Richman Petroleum Corp., completed August 27, 1982.

The RRC has issued one drilling permit, issued May 18, 1982, permitted to 3,500 ft.

It was permitted by Republic Mineral Corporation and has since transferred to Richman Petroleum Corp. on the wellbore schedule.

Its 2 leases have reported 60.4K barrels of oil and 40 mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Richman Petroleum Corp.

Permitted by Republic Mineral Corporation; the EWA schedule now lists a different operator.

Based in
Grapevine, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 29, 2004
Permits on file
94
Phone
(817) 329-4427

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRichman Petroleum Corp.
Production reportsHigh Desert Resources, L.L.C.through Jan 2023
Latest permitRepublic Mineral CorporationMay 18, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
May 18, 1982
last permit issued
Aug 27, 1982
completed
60.4K
cumulative oil, bbl
40
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 27, 1982
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Guitar, Earl Jr. O-10-27593MooreHigh Desert Resources, L.L.C.757.9K20Jan 1993 – Jul 2026
Guitar, Earl Jr. -C- O-10-28250MooreRichman Petroleum Corp.12.5K20Jan 1993 – Oct 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Graham Royalty, Ltd.Jan 1993 → Oct 1993
  2. 2Midpar L.P.Nov 1993 → Jan 1994
  3. 3Dune Oil and Gas, Inc.Feb 1994 → Jul 1994
  4. 4Allegro Operating, Inc.Aug 1994 → Feb 1999
  5. 5Richman Petroleum Corp.Mar 1999 → Feb 2001
  6. 6Scope Operating CompanyMar 2001 → Feb 2002
  7. 7Vaca Operating Company LLCMar 2002 → Dec 2002
  8. 8Millennium Resources, LLC.Jan 2003 → Jan 2006
  9. 9Millennium Resources, LPFeb 2006 → Dec 2020
  10. 10Whetstone Resources, LLCMay 2021 → May 2021
  11. 11High Desert Resources, L.L.C.Jul 2022 → Jan 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
160869-99DrillRepublic Mineral CorporationMay 18, 1982May 18, 1982May 22, 19823,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-27593————
—— O-10-28250————

Perforations

Perforated and open-hole intervals.

FromToType
3,0353,091Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515012.25145 S
2.3753,035——
4.53,2507.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 1999——
00Jan 12, 1984Sep 14, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22732758, documented in the API reference.