TEXAS · WELLS · HOWARD COUNTY · API 42-227-32850 · DISTRICT 08

Coleman, Frankie et Al #1

Plugged

Howard County  · Vertical

Coleman, Frankie ET AL #1 (API 42-227-32850) is a plugged well in Howard County, plugged September 18, 1985, last operated by Rosewood Resources, Inc..

The RRC has issued 2 drilling permits between 1982 and 1985, permitted to 10,200 ft.

Operator of record

Rosewood Resources, Inc.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 21, 2025
Permits on file
469
Phone
(214) 849-9300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRosewood Resources, Inc.Jul 3, 1985
10,200
total depth, ft
2
permits on file
Jul 3, 1985
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 18, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
279418-99OtherRosewood Resources, Inc.Jun 25, 1985Jul 3, 1985—7,800
169180-99DrillMarathon Oil CompanyAug 13, 1982Aug 13, 1982—10,200

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082469W-14 DisposalNot activated2,5001,0003,123–4,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22732850, documented in the API reference.