WELL · 42-227-33837 · DISTRICT 8

Denton #1

Plugged

Howard County · Elbow SE. (Wolfcamp) field  · Vertical

Denton #1 (API 42-227-33837) is a plugged well in Howard County, plugged April 29, 2020, last operated by Jay Management Company LLC.

The RRC has issued 3 drilling permits between 1985 and 1987, permitted to 10,300 ft.

It was permitted by Chapman Exploration, Inc. and has since transferred to Jay Management Company LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Wolfcamp, Strawn, Fusselman, Ellenburger.

Its lease has reported 29.7K barrels of oil and 39.3K mcf of gas since January 1993, last reporting in June 2026.

Operator of record

Jay Management Company LLC

Permitted by Chapman Exploration, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 28, 2026
Permits on file
26
Phone
(713) 621-6785

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJay Management Company LLC
Production reportsJay Management Company, LLCthrough Aug 2012
Latest permitChapman Exploration, Inc.Aug 18, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,300
total depth, ft
3
permits on file
Aug 18, 1987
last permit issued
Aug 4, 1987
completed
29.7K
cumulative oil, bbl
39.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 4, 1987
Shut in
—
Plugged
Apr 29, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Denton O-10-31390Elbow, SE. (Wolfcamp)Jay Management Company, LLC129.7K39.3KJan 1993 – Jun 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Farmers of Tulsa Energy Corp.Jan 1993 → Feb 1996
  2. 2Jay Resources CorporationMar 1996 → Sep 1997
  3. 3Jay Management Company, LLCOct 1997 → Aug 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
334439-99RecompletionChapman Exploration, Inc.Aug 13, 1987Aug 18, 1987—10,135
301092-99DrillChapman Exploration, Inc.Apr 14, 1986Apr 15, 1986—10,135
284064-99DrillChapman Exploration, Inc.Aug 28, 1985Aug 29, 1985Sep 12, 198510,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-31390————

Formation tops

As filed on W-2/G-1. Subsea from 2,618 ft elevation.Download CSV →

FormationMD ftSubsea
Wolfcamp7,935-5,317
Strawn9,310-6,692
Fusselman10,036-7,418
EllenburgerELLENBERGER10,130-7,512
Ellenburger10,130-7,512

Perforations

Perforated and open-hole intervals.

FromToType
9,1449,180Perforated
9,3139,348Perforated
10,03610,040Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37527015.5270 S
8.6253,865111,000 S
4.510,1307.8751,020 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 29, 1987Sep 1, 1987Yes
00Sep 22, 1987——
00Jun 10, 1986May 30, 1986Yes
00Jun 7, 1986——
00Jan 27, 1986Jan 15, 1986Yes
00Jan 24, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22733837, documented in the API reference.