TEXAS · WELLS · HOWARD COUNTY · API 42-227-34831 · DISTRICT 7B

Talbot-Fuller Canyon Unit #1

Plugged

Howard County · Talbot (Canyon) field  · Vertical

Talbot-Fuller Canyon Unit #1 (API 42-227-34831) is a plugged well in Howard County, plugged January 2, 2013, last operated by Costilla Petroleum Corporation.

The RRC has issued one drilling permit (amended once), issued April 26, 1994, permitted to 10,500 ft.

Its 2 leases have reported 141K barrels of oil and 1.04M mcf of gas since July 1994, last reporting in January 2018. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Costilla Petroleum Corporation

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 12, 1996
Permits on file
120
Phone
(432) 683-3092

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBTA Oil Producers LLC
Production reportsBTA Oil Producers, LLCthrough Oct 2012
Latest permitCostilla Petroleum CorporationApr 26, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Apr 26, 1994
last permit issued
Jul 28, 1994
completed
141K
cumulative oil, bbl
1.04M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1994 THROUGH Jan 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 28, 1994
Shut in
—
Plugged
Jan 2, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Talbot-Fuller Canyon Unit O-10-34433Talbot (Canyon)BTA Oil Producers, LLC1141K943KMar 1995 – Jan 2018
Talbot-Fuller Canyon Unit G-10-151298Talbot (Canyon)Costilla Petroleum Corporation1091.8KJul 1994 – Jun 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Costilla Petroleum CorporationAug 1994 → Jan 1997
  2. 2Costilla Energy, Inc.Feb 1997 → Jun 2000
  3. 3Dreyfus, Louis Natural Gas CorpJul 2000 → Nov 2001
  4. 4Dominion Oklahoma Texas E&P, IncDec 2001 → Oct 2003
  5. 5BTA Oil ProducersNov 2003 → Jan 2008
  6. 6BTA Oil Producers, LLCFeb 2008 → Oct 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
423341-97DrillCostilla Petroleum CorporationJun 24, 1994Apr 26, 1994Jul 6, 199410,500
423341-99DrillCostilla Petroleum CorporationApr 26, 1994Apr 26, 1994—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 28, 1994Talbot-Fuller Canyon Unit G-10-151298Talbot (Canyon)Costilla Petroleum CorporationPlugged—
Jul 22, 1994Talbot-Fuller Canyon Unit O-10-34433Talbot (Canyon)BTA Oil Producers LLCPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,6218,635Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37533517.5350 S
8.6253,12511200 S
5.58,6157.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 17, 1995Mar 8, 1995—
00Mar 29, 1995——
00Oct 28, 1994Sep 6, 1994Yes
00Oct 14, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22734831, documented in the API reference.