WELL · 42-227-34845 · DISTRICT 8
Dillard #1
Howard County · Vertical
Dillard #1 (API 42-227-34845) is a plugged well in Howard County, plugged September 28, 1994, last operated by Lyco Energy Corporation.
The RRC has issued 3 drilling permits between 1994 and 1996, permitted to 9,300 ft.
Completion filings report 2 formation tops, including Leonard, Canyon.
Its 2 leases have reported 59.2K barrels of oil and 71.6K mcf of gas since February 1996, last reporting in June 2016. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Oct 4, 2002 · 150 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Endeavor Energy Resources L.P.through Jun 2013 |
| Latest permit | Lyco Energy CorporationJun 4, 1996 |
- 9,300
- total depth, ft
- 3
- permits on file
- Jun 4, 1996
- last permit issued
- —
- completed
- 59.2K
- cumulative oil, bbl
- 71.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Jun 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Sep 28, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dillard O-10-35006 | B.C. (Dean) | Endeavor Energy Resources L.P. | 1 | 58.8K | 64.8K | Jun 1996 – Jun 2016 |
| Dillard O-10-34864 | B.C. (Canyon) | Endeavor Energy Resources L.P. | 1 | 359 | 6.81K | Feb 1996 – Jul 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lyco Energy CorporationFeb 1996 → Nov 1998
- 2Stephens, Autry C.Dec 1998 → Aug 2000
- 3Endeavor Energy Resources L.P.Sep 2000 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 448877-99 | Recompletion | Lyco Energy Corporation | Jun 4, 1996 | Jun 4, 1996 | Jun 10, 1996 | 9,000 |
| 441641-99 | Reenter | Lyco Energy Corporation | Nov 7, 1995 | Nov 10, 1995 | Dec 4, 1995 | 9,220 |
| 426117-99 | Drill | Marshall & Winston, Inc. | Jul 21, 1994 | Jul 21, 1994 | Sep 9, 1994 | 9,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-34864 | — | — | — | — |
| — | — O-10-35006 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,609 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,356 | 7,386 | Perforated |
| 9,048 | 9,056 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 301 | 17.5 | 325 S |
| 9.625 | 3,857 | 12.25 | 1,620 S |
| 5.5 | 9,217 | 8.75 | 345 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 27, 1996 | Jun 19, 1996 | Yes |
| 00 | Aug 9, 1996 | — | — |
| 00 | Apr 15, 1996 | Mar 5, 1996 | Yes |
| 00 | Mar 26, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-34845 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-34845 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22734845, documented in the API reference.